Knowledge
Laws and regulations for surveying in MV
The main regulations for land surveying, building, costs and land consolidation in Mecklenburg-Vorpommern, with a link to the official text. The laws are only available in German.
- Cadastral surveying (Liegenschaftsvermessung)
- Building law (Baurecht)
- Cost law (Kostenrecht)
- Land consolidation (Flurneuordnung)
- Construction contract and floor areas (Bauvertrag und Flächen)
Cadastral surveying (Liegenschaftsvermessung)
Do you want to buy a plot or sell part of your plot? Do you plan to build on your plot and have the buildings surveyed? Or do you want to know where the boundaries of your plot run? We advise you and support your project with our range of services in land surveying.
- Geoinformations- und Vermessungsgesetz (GeoVermG M-V) (in German): Geoinformation and Surveying Act of MV. It covers the real estate cadastre (Liegenschaftskataster), the determination of boundaries (Grenzfeststellung, § 29), boundary marking (Abmarkung, § 30) and the survey of buildings (Gebäudeeinmessung, § 28).
- Berufsordnung der Öffentlich bestellten Vermessungsingenieure (BO-ÖbVI M-V) (in German): professional code of the publicly appointed surveying engineers (ÖbVI) in MV.
- Liegenschaftsvermessungsvorschrift (LiVermVV M-V) (in German, as of 16 March 2026): administrative rules for carrying out cadastral surveys, including parcelling without a local survey (Sonderung).
Requirements for parcelling without a local survey (Sonderungsvoraussetzungen)
Requirements for forming parcels (Flurstücke) without a local survey (Sonderungsvoraussetzungen)
In suitable cases, parcels can also be formed without a local survey (Sonderung). Under No. 4.1.5.3 LiVermVV M-V, this is possible if the following requirements are met:
- all existing boundary points of the part of a plot to be separated (Trennstück) and of the boundaries into which it is to be integrated must have been determined in accordance with § 29(1) GeoVermG M-V,
- the positions of all boundary points named under a) must meet the quality requirements listed in No. 4.1.1.8 a),
- the applicant must declare that they waive the right to have the boundary points shown on site,
- the property owner, the holder of a heritable building right (Erbbauberechtigte) and, if applicable, the buyer must be informed of the obligation to have the boundary marked later, unless boundary marking can be omitted in accordance with § 30(2) GeoVermG M-V, and
- none of the planned parcel boundaries runs through a building, unless the building is to be demolished. The planned demolition can be proven, for example, by a legally effective declaration to the building authority that the use is given up, or by legally binding planning documents.
Under No. 4.1.5.4 LiVermVV M-V, parcelling without a local survey is permitted without the requirements of No. 4.1.5.3 if the planned parcel boundaries
- are to serve the appropriate division within road, path or water parcels between a maximum of two future neighbouring boundary points (a polygonal course over several planned boundary points is not permitted), and it is ruled out that the new parcels are to be made available for sale or transfer,
- are only to remain in place in a land readjustment or consolidation procedure (Bodenordnungsverfahren) until the new legal situation takes effect,
- are to reverse a merger of parcels (Verschmelzung) or
- serve to form parcels on land that has not yet been recorded in the cadastre.
Building law (Baurecht)
- Landesbauordnung Mecklenburg-Vorpommern (LBauO M-V) (in German): building code of the state of MV. Among other things, it sets the setback areas (Abstandsflächen, § 6).
- Bauvorlagenverordnung (BauVorlVO M-V) (in German): regulation on building application documents. It covers the site plan (Lageplan) as part of the building application (§ 7).
- Baugesetzbuch (BauGB) (in German): Federal Building Code. It covers development plans (Bebauungspläne) and standard land values (Bodenrichtwerte, § 196).
More on this: Site plan for the building application, Surveying for builders.
Cost law (Kostenrecht)
- Vermessungskostenverordnung (VermKostVO M-V) (in German): surveying costs regulation. It sets the fees for official surveys.
- Verwaltungskostengesetz (VwKostG M-V) (in German): Administrative Costs Act of MV.
- Honorarordnung für Architekten und Ingenieure (HOAI) (in German): fee structure for architects and engineers. It covers engineering surveys (Ingenieurvermessung, Annex 1 No. 1.4).
More on this: How much does a boundary survey cost?
Land consolidation (Flurneuordnung)
- Flurbereinigungsgesetz (FlurbG) (in German): Land Consolidation Act.
- Landwirtschaftsanpassungsgesetz (LwAnpG) (in German): Agricultural Adjustment Act. It covers land readjustment (Bodenordnung) and the suitable body (geeignete Stelle) under § 53(4).
More on this: Land consolidation.
Construction contract and floor areas (Bauvertrag und Flächen)
- Vergabe- und Vertragsordnung für Bauleistungen, Teil B (VOB/B): German construction contract procedures, part B. Under § 3(2), the first setting out (Erstabsteckung) is a task of the client.
- Wohnflächenverordnung (WoFlV) (in German): Living Space Ordinance. It sets how the living area is calculated.
More on this: Construction surveying, Rentable and living areas.