Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 2 Rambin OT Rothenkirchen Biogasanlage Rambin
The development plan covers an area in the municipality of Rambin (Rothenkirchen area), Landkreis Vorpommern-Rügen. It has been in force since 16 August 2011. The plan area covers about 2.2 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Rambin
Village or district Rothenkirchen - District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 16 August 2011
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 2 - Area
- about 2.2 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For an energy facility in this area, you usually need these surveys.
-
To secure the land: land parcels and owners
We find out which land parcels the project touches and who owns them, from the real estate cadastre (Liegenschaftskataster) and the land register (Grundbuch). Surveying for wind and solar farms
-
For the planning: topographic survey plan
Boundaries, existing features and terrain, for large areas also as a terrain model from a drone flight.
-
For the permit: site plan
Whether it is a building application or an application under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz): the site plan under BauVorlVO M-V is part of it, if needed with the documents for a public easement (Baulast), for example for an access road.
-
Before building starts: setting out
Foundations, fence, module rows, crane pads and access roads, on request during construction.
-
After completion: building survey and as-built records
Official survey where it is required, for example for wind turbines, plus an as-built plan and cable routes. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 17 Rambin Rothenkirchen West
In progress: Decision to draw up the plan 550 m away
-
Innenbereichssatzung Rambin OT Rambin Bahnhofstr.
In force since 17 October 2003 2.6 km away
-
BPlan Nr. 11 Rambin OT Rambin Nördlich des Sportplatzes
In force since 1 August 2020 2.6 km away
-
Vorhabensbezogener BPlan Nr. 2 Samtens OT Muhlitz Großwerbeanlage
In force since 7 November 2018 2.7 km away Samtens
-
BPlan Nr. 3 Samtens OT Samtens Wohnpark Gingster Str. 2. Änderung
In force since 20 June 2019 2.7 km away Samtens 2 versions
-
BPlan Nr. 3 Rambin OT Rambin Am Kubitzer Bodden 1. Änderung
In force since 23 August 2005 2.7 km away 2 versions
-
BPlan Nr. 5 Rambin OT Rambin Wohngebiet Boddenblick
In force since 1 August 2003 2.7 km away
-
Vorhabensbezogener BPlan Nr. 1 Samtens OT Samtens Einzelhandel Gingster Straße
In force since 30 December 2018 2.8 km away Samtens
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.