Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 1 Samtens OT Samtens Einzelhandel Gingster Straße
The development plan covers an area in the municipality of Samtens, Landkreis Vorpommern-Rügen. It has been in force since 30 December 2018. The plan area covers about 5,240 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Samtens
- District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 30 December 2018
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 1
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 5,240 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a shop or commercial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 3 Samtens OT Samtens Wohnpark Gingster Str. 2. Änderung
In force since 20 June 2019 200 m away 2 versions
-
Innenbereichssatzung Nr. 2 Samtens OT Samtens Ergänzungssatzung Kapellenberg
In force since 8 May 2015 500 m away
-
BPlan Nr. 6 Samtens OT Samtens Dorfmitte 2. Änderung
In force since 22 January 2013 500 m away 3 versions
-
Vorhaben- und Erschliessungsplan Nr. 1 Samtens OT Samtens Sport- und Freizeitanlage
In force since 7 May 1997 750 m away
-
Vorhabensbezogener BPlan Nr. 1 Samtens OT Samtens Sport- und Freizeitanlage 1. Änderung
In force since 1 June 1999 750 m away
-
Vorhaben- und Erschliessungsplan Nr. 1 Samtens OT Samtens Rügen, Tiet und Wiel 1. Änderung
In force since 11 June 1999 750 m away 2 versions
-
BPlan Nr. 2 Samtens OT Samtens Gewerbegebiet B 96, Plüggentiner Str.
In force since 18 October 2000 900 m away
-
BPlan Nr. 10 Samtens OT Negast Sondergebiet Ferienanlage
In force since 22 January 2013 1.1 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.