Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 3 Gottesgabe OT Groß Welzin Gewerbegebiet, Metallbau Geerds
The development plan covers an area in the municipality of Gottesgabe (Groß Welzin area), Landkreis Nordwestmecklenburg. It has been in force since 9 April 2021. The plan area covers about 4.5 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Gottesgabe
Village or district Groß Welzin - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 9 April 2021
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 3 - Area
- about 4.5 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Dümmer Pflegeheim Dümmer
In force since 26 September 2013 2.5 km away Dümmer
-
Innenbereichssatzung Dümmer Stücker Straße
In force since 27 January 1998 2.6 km away Dümmer
-
Innenbereichssatzung Perlin OT Perlin Dorf und Mitte 4. Änderung
In force since 20 November 2018 2.7 km away Perlin 5 versions
-
Innenbereichssatzung Dümmer Dümmerstück Hof
In force since 23 December 2004 3.0 km away Dümmer
-
Innenbereichssatzung Grambow OT Wodenhof
In force since 22 February 2010 3.1 km away Grambow
-
Vorhabensbezogener BPlan Nr. 2 Gottesgabe OT Klein Welzin Windpark
In force since 26 September 1996 3.3 km away
-
Innenbereichssatzung Schildetal OT Renzow 2. Änderung
In force since 11 July 2006 3.6 km away Schildetal 2 versions
-
BPlan Nr. 2 Gottesgabe OT Gottesgabe Im Wiesengrund
In force since 18 October 1996 3.6 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.