Inner area bylaw (Innenbereichssatzung) · In force
Innenbereichssatzung Schildetal OT Renzow 2. Änderung
The bylaw covers an area in the municipality of Schildetal (Renzow area), Landkreis Nordwestmecklenburg. It has been in force since 11 July 2006. The plan area covers about 41.5 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 15 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 15 October 2026
- Location
- Schildetal
Village or district Renzow - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 11 July 2006
- Type of plan
- Inner area bylaw (Innenbereichssatzung)
No. 0 - Area
- about 41.5 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is an inner area bylaw?
With it the municipality decides which land belongs to the built-up part of a town or village (§ 34 Abs. 4 BauGB). There a project is allowed if it fits in with the character of the buildings around it and access and services are secured (§ 34 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version (this page)
Innenbereichssatzung Schildetal OT Renzow 2. Änderung
In force since 11 July 2006 about 41.5 ha
-
Amendment no. 1
Innenbereichssatzung Schildetal OT Renzow 1. Änderung
In force since 7 July 2002 about 9,060 m²
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 1 Schildetal Sondergebiet Windenergieanlagen
In force since 26 June 2014 2.2 km away
-
Innenbereichssatzung Pokrent OT Pokrent und Neuendorf
In force since 11 June 1997 2.7 km away Pokrent
-
BPlan Nr. 1 Pokrent OT Pokrent Am Wald
In force since 23 September 1994 2.7 km away Pokrent
-
Innenbereichssatzung Schildetal OT Badow
In force since 3 July 1998 2.8 km away
-
Innenbereichssatzung Pokrent OT Pokrent Neuzeichnung
In force since 7 July 2009 2.9 km away Pokrent
-
Vorhabensbezogener BPlan Nr. 1 Lützow OT Lützow Erweiterung Eigenheimbau Pokrenter Str.
In force since 19 April 1991 3.1 km away Lützow
-
BPlan Nr. 6 Lützow OT Lützow Sportanlage Pokrenter Str.
In force since 17 July 2006 3.1 km away Lützow
-
Innenbereichssatzung Nr. 10 Lützow Ergänzungssatzung Lützow, Pokrenter Straße, 2-Feld-Sporthalle
In progress: Early consultation of authorities 3.3 km away Lützow
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 15 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.