Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung) · In force
Innenbereichssatzung Nr. 01/94 Torgelow, Stadt OT Heinrichsruh
The bylaw covers an area in Stadt Torgelow (Heinrichsruh area), Landkreis Vorpommern-Greifswald. It has been in force since 25 August 1995. The plan area covers about 16.3 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Torgelow
Village or district Heinrichsruh - District
- Vorpommern-Greifswald
Surveying in this region - Legal status
- In force since 25 August 1995
- Type of plan
- Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung)
No. 01/94 - Area
- about 16.3 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a clarification bylaw?
It sets the limits of the built-up part of a town or village (§ 34 Abs. 4 Satz 1 Nr. 1 BauGB). Inside these limits, what you may build depends on the buildings around it.
What is a supplementary bylaw?
It adds single pieces of land from the outlying area to the built-up part of a town or village, if the buildings next to them shape their character (§ 34 Abs. 4 Satz 1 Nr. 3 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Nr. 01/16 Torgelow, Stadt OT Heinrichsruh
In force since 16 March 2017 150 m away
-
BPlan Nr. 01 Torgelow, Stadt Wohn- und Wochenendhausgebiet "Am Waldrand" OT Heinrichsruh
In force since 18 May 2005 850 m away
-
Innenbereichssatzung Nr. 01/2020 Torgelow, Stadt "Müggenburg Nr. 1-11"
In force since 21 January 2021 2.1 km away
-
BPlan Nr. 04/13 Ferdinandshof "Bebauung Wiesenperle"
In force since 16 July 2015 2.5 km away Ferdinandshof
-
Vorhabensbezogener BPlan Nr. 01/09 Ferdinandshof "Photovoltaikanlage Blumenthal" 1. Änderung
In force since 13 March 2013 3.4 km away Ferdinandshof 2 versions
-
BPlan Nr. 06/19 Ferdinandshof "Photovoltaikanlage westlich der Anklamer Straße "
In force since 17 September 2022 3.6 km away Ferdinandshof
-
Vorhabensbezogener BPlan Nr. 02/11 Ferdinandshof "Biogasanlage Blumenthal"
In force since 22 March 2012 3.8 km away Ferdinandshof
-
BPlan Nr. 02/17 Wilhelmsburg "Photovoltaikanlage nordwestlich von Johannesberg"
In force since 15 June 2018 4.5 km away Wilhelmsburg
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.