Development bylaw (Entwicklungssatzung) and Supplementary bylaw (Ergänzungssatzung) · In force
Innenbereichssatzung Nr. 2 Neuburg OT Neu Farpen 1. Änderung
The bylaw covers an area in the municipality of Neuburg (Neu Farpen area), Landkreis Nordwestmecklenburg. It has been in force since 20 September 2012. The plan area covers about 1,520 square metres.
There is a newer version: Amendment no. 2, In force since 27 May 2015
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Neuburg
Village or district Neu Farpen - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 20 September 2012
- Type of plan
- Development bylaw (Entwicklungssatzung) and Supplementary bylaw (Ergänzungssatzung)
No. 2 - Area
- about 1,520 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a development bylaw?
It declares built-up land in the outlying area to be part of the built-up town or village, if the land use plan (Flächennutzungsplan) shows it as building land (§ 34 Abs. 4 Satz 1 Nr. 2 BauGB).
What is a supplementary bylaw?
It adds single pieces of land from the outlying area to the built-up part of a town or village, if the buildings next to them shape their character (§ 34 Abs. 4 Satz 1 Nr. 3 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version
Innenbereichssatzung Nr. 2 Neuburg OT Neu Farpen 2. Änderung
In force since 27 May 2015 about 800 m²
-
Amendment no. 1 (this page)
Innenbereichssatzung Nr. 2 Neuburg OT Neu Farpen 1. Änderung
In force since 20 September 2012 about 1,520 m²
-
Original version
Innenbereichssatzung Nr. 2 Neuburg OT Neu Farpen
In force since 20 July 2002 about 4.1 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 13 Neuburg OT Neuburg Wohnbebeuung Lindenweg-Mühlenweg 1. Änderung
In force since 20 April 2017 1.2 km away 2 versions
-
BPlan Nr. 5 Neuburg OT Neuburg Am Kirchsteig 1. Änderung
In force since 21 April 2015 1.4 km away 2 versions
-
BPlan Nr. 3 Neuburg OT Neuburg Wohngebiet Am Hageböker Weg 1. Änderung
In force since 2 August 2017 1.4 km away 2 versions
-
BPlan Nr. 4 Neuburg OT Neuburg Gemeindezentrum 2. Änderung
In force since 28 July 2012 1.6 km away 2 versions
-
Innenbereichssatzung Nr. 2 Neuburg OT Neuburg Wiesenweg
In force since 14 September 1995 1.6 km away
-
Vorhabensbezogener BPlan Nr. 1 Neuburg OT Neuburg ehemalige Hühnerfarm
In force since 1 June 1996 1.7 km away
-
BPlan Nr. 9 Krusenhagen "Wohnbebauung an der Hauptstraße" in Krusenhagen
In progress: Draft 1.8 km away Krusenhagen
-
Innenbereichssatzung Nr. 3 Neuburg OT Kartlow 1. Änderung
In force since 15 May 2004 1.9 km away 2 versions
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.