Simple development plan (einfacher Bebauungsplan) · Draft
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" , 8. Änderung 8. Änderung
The development plan covers an area in the municipality of Roggentin, Landkreis Rostock. It is being drawn up (last known step: Draft). The plan area covers about 55.7 hectares.
There is a newer version: Amendment no. 8, In force since 13 April 2026
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Roggentin
- District
- Landkreis Rostock
Surveying in this region - Legal status
- In progress: Draft
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 3 - Area
- about 55.7 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 8, latest version
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 8. Änderung 8. Änderung
In force since 13 April 2026 about 55.5 ha
-
Amendment no. 8 (this page)
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" , 8. Änderung 8. Änderung
In progress: Draft about 55.7 ha
-
Amendment no. 7
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 7. Änderung 7. Änderung
In force since 16 April 2021 about 55.5 ha
-
Amendment no. 6
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 6. Änderung 6. Änderung
In force since 20 September 2015 about 55.5 ha
-
Amendment no. 5
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 5. Änderung 5. Änderung
In force since 16 October 2011 about 55.5 ha
-
Amendment no. 4
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 4. Änderung 4. Änderung
In force since 21 May 2010 about 55.5 ha
-
Amendment no. 3
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 3. Änderung 3. Änderung
In force since 21 May 2009 about 55.5 ha
-
Amendment no. 2
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 2. Änderung 2. Änderung
In force since 21 February 2004 about 55.5 ha
-
Amendment no. 1
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 1. Änderung 1. Änderung
In force since 21 May 1996 about 55.5 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" Ursprungsplan
In force since 26 January 1996 under 100 m away
-
BPlan Nr. 2 Roggentin Gewerbegebiet "Pastower Weg" 2. Änderung 2. Änderung
In force since 16 October 2011 500 m away 2 versions
-
BPlan Nr. 2 Roggentin Gewerbegebiet "Pastower Weg" Ursprungsplan
In force since 26 May 1992 500 m away
-
BPlan Nr. 5 Roggentin Wohngebiet Kösterbeck 5. Änderung 5. Änderung
In force since 1 October 2005 750 m away 5 versions
-
BPlan Nr. 5 Roggentin Wohngebiet Kösterbeck Ursprungsplan
In force since 24 February 1996 750 m away
-
BPlan Nr. 7 Roggentin Mischgebiet "An der Dorfstraße" Ursprungsplan
In force since 21 May 2012 750 m away
-
BPlan Nr. 4 Roggentin Dorfgebiet Roggentin Nordost 2. Änderung 2. Änderung
In force since 21 January 2010 800 m away
-
BPlan Nr. 4 Roggentin Dorfgebiet Roggentin Nordost Ursprungsplan
In force since 14 January 1993 800 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.