Development plan (Bebauungsplan) · In force
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 1. Änderung 1. Änderung
The development plan covers an area in the municipality of Roggentin, Landkreis Rostock. It has been in force since 21 May 1996. The plan area covers about 55.5 hectares.
There is a newer version: Amendment no. 8, In force since 13 April 2026
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Roggentin
- District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 21 May 1996
- Type of plan
- Development plan (Bebauungsplan)
No. 3 - Area
- about 55.5 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 8, latest version
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 8. Änderung 8. Änderung
In force since 13 April 2026 about 55.5 ha
-
Amendment no. 8
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" , 8. Änderung 8. Änderung
In progress: Draft about 55.7 ha
-
Amendment no. 7
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 7. Änderung 7. Änderung
In force since 16 April 2021 about 55.5 ha
-
Amendment no. 6
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 6. Änderung 6. Änderung
In force since 20 September 2015 about 55.5 ha
-
Amendment no. 5
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 5. Änderung 5. Änderung
In force since 16 October 2011 about 55.5 ha
-
Amendment no. 4
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 4. Änderung 4. Änderung
In force since 21 May 2010 about 55.5 ha
-
Amendment no. 3
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 3. Änderung 3. Änderung
In force since 21 May 2009 about 55.5 ha
-
Amendment no. 2
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 2. Änderung 2. Änderung
In force since 21 February 2004 about 55.5 ha
-
Amendment no. 1 (this page)
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" 1. Änderung 1. Änderung
In force since 21 May 1996 about 55.5 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 3 Roggentin Gewerbe- und Industriegebiet "Bornkoppelweg" Ursprungsplan
In force since 26 January 1996 under 100 m away
-
BPlan Nr. 2 Roggentin Gewerbegebiet "Pastower Weg" 2. Änderung 2. Änderung
In force since 16 October 2011 500 m away 2 versions
-
BPlan Nr. 2 Roggentin Gewerbegebiet "Pastower Weg" Ursprungsplan
In force since 26 May 1992 500 m away
-
BPlan Nr. 5 Roggentin Wohngebiet Kösterbeck 5. Änderung 5. Änderung
In force since 1 October 2005 700 m away 5 versions
-
BPlan Nr. 5 Roggentin Wohngebiet Kösterbeck Ursprungsplan
In force since 24 February 1996 700 m away
-
BPlan Nr. 4 Roggentin Dorfgebiet Roggentin Nordost 2. Änderung 2. Änderung
In force since 21 January 2010 750 m away
-
BPlan Nr. 4 Roggentin Dorfgebiet Roggentin Nordost Ursprungsplan
In force since 14 January 1993 750 m away
-
BPlan Nr. 7 Roggentin Mischgebiet "An der Dorfstraße" Ursprungsplan
In force since 21 May 2012 800 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.