Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 24 Papendorf Am Schwanen-Soll
The development plan covers an area in the municipality of Papendorf, Landkreis Rostock. It has been in force since 23 May 2026. The plan area covers about 15.8 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 12 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 12 October 2026
- Location
- Papendorf
- District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 23 May 2026
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 24 - Area
- about 15.8 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Plan content
Where and how you may build
The map above shows what the plan sets for each area. Tap an area to learn more.
Not legally binding. Our view is a reading aid. Legally, only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal
The sub-areas at a glance
Sub-areas with the same provisions share one row.
| Sub-area | Purpose | Buildable | Full storeys | Building height | Building style | Roof |
|---|---|---|---|---|---|---|
| SO 1 Other special area | Nahversorgung | up to 80 % of the area (GRZ 0.8) | special | at most 6 degrees | ||
| SO 1 Building envelope | at most 4 | at most 17 m | ||||
| SO 1 Building envelope | at most 5 | at most 20 m | ||||
| SO 2 Other special area | Betreutes Wohnen und Pflege | up to 60 % of the area (GRZ 0.6) | special | at most 6 degrees | ||
| SO 2 Building envelope | at most 3 | at most 11 m | ||||
| SO2, WA9, WA10, WA13, WA15 Building envelope | at most 5 | at most 18 m | ||||
| WA 1, 2, 3, 4, 5 General residential area | up to 40 % of the area (GRZ 0.4) | at most 2 | at most 9 m | detached | at most 36 degrees | |
| WA 6, 7, 8, 11 General residential area | up to 40 % of the area (GRZ 0.4) | at most 3 | at most 11 m | detached | at most 6 degrees | |
| WA 9, 10, 13, 15 General residential area | up to 40 % of the area (GRZ 0.4) | special | at most 6 degrees | |||
| WA 9, 10, 13, 15 Building envelope | at most 4 | at most 15 m | ||||
| WA 12, 14, 16 General residential area | up to 40 % of the area (GRZ 0.4) | at most 3 | at most 11 m | special | at most 6 degrees |
What the map shows
-
General residential area
For this area the plan sets what may be built and how much.
-
Other special area
For this area the plan sets what may be built and how much.
-
Building envelope (12)
Buildings must stand inside the building line. Ancillary structures such as garages may be allowed outside, unless the plan says otherwise. In the plan: Buildable plot area with building line (Section 23 BauNVO).
-
Boundary between different uses (17)
Separates areas for which the plan sets different uses or dimensions.
-
Green space (16)
Area that stays green, for example a park, playground or garden.
-
Roads and paths (9)
Area for roads, paths and squares. In the plan: Traffic area.
-
Road boundary line (13)
Boundary between road and building plot.
-
Planting of trees and shrubs (51)
What the plan sets out must be planted here: trees, shrubs or other planting.
-
Keeping trees and shrubs (3)
What grows here must be kept: trees, shrubs or other planting.
-
Area for nature and landscape
Nature and landscape must be protected, cared for or developed here.
-
Special purpose
Area for a specific purpose named in the plan, for example a café. In the plan: Area with a special purpose (Section 9 (1) No. 9 BauGB).
-
Right of way or utility right (3)
The area must stay accessible for paths or utility lines.
-
Utilities (5)
Area or line for electricity, water, sewage or similar.
-
Kept free of buildings
This area must not be built on, for example because a road, railway or utility line is planned here.
-
Monument (2)
There is a monument here, for example an archaeological site. Building or moving earth here usually needs approval from the heritage authority. In the plan: Area under heritage law.
Only the original plan of the municipality is legally binding. This view is a reading aid. As of 12.10.2026.
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 09.W.28 Rostock, Hanse- und Universitätsstadt Wohnbaufläche Biestow
In force since 24 March 1995 450 m away Hanse- und Universitätsstadt Rostock
-
BPlan Nr. 09.W.28_1 Rostock, Hanse- und Universitätsstadt Wohnbaufläche Biestow, 1. Änderung
In force since 10 March 1999 450 m away Hanse- und Universitätsstadt Rostock
-
BPlan Nr. 09.W.28_2 Rostock, Hanse- und Universitätsstadt Wohnbaufläche Biestow, 2. Änderung
In force since 20 October 2010 450 m away Hanse- und Universitätsstadt Rostock
-
BPlan Nr. 09.GE.61 Rostock, Hanse- und Universitätsstadt Nobelstraße II
In force since 5 July 1996 450 m away Hanse- und Universitätsstadt Rostock
-
BPlan Nr. 13.W.189 Rostock, Hanse- und Universitätsstadt Wohngebiet Nobelstraße
In force 500 m away Hanse- und Universitätsstadt Rostock
-
In force since 24 January 2007 950 m away Hanse- und Universitätsstadt Rostock
-
BPlan Nr. 09.W.57 Rostock, Hanse- und Universitätsstadt Dorflage Biestow
In force since 29 December 2000 950 m away Hanse- und Universitätsstadt Rostock
-
BPlan Nr. 09.W.57_1 Rostock, Hanse- und Universitätsstadt Dorflage Biestow, 1. Änderung
In force since 1 November 2007 950 m away Hanse- und Universitätsstadt Rostock
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 12 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.