Qualified development plan (qualifizierter Bebauungsplan) · In force

BPlan Nr. 24 Papendorf Am Schwanen-Soll

The development plan covers an area in the municipality of Papendorf, Landkreis Rostock. It has been in force since 23 May 2026. The plan area covers about 15.8 hectares.

Request a quote

Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 12 October 2026. Sources and notes

At a glance

Details according to the Bauportal M-V, as of 12 October 2026

Location
Papendorf
District
Landkreis Rostock
Surveying in this region
Legal status
In force since 23 May 2026
Type of plan
Qualified development plan (qualifizierter Bebauungsplan)
No. 24
Area
about 15.8 ha

Legal status

Can you build here?

The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.

Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).

What is a qualified development plan?

It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).

Plan content

Where and how you may build

The map above shows what the plan sets for each area. Tap an area to learn more.

Not legally binding. Our view is a reading aid. Legally, only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal

The sub-areas at a glance

Sub-areas with the same provisions share one row.

Sub-area Purpose Buildable Full storeys Building height Building style Roof
SO 1 Other special area Nahversorgung up to 80 % of the area (GRZ 0.8) special at most 6 degrees
SO 1 Building envelope at most 4 at most 17 m
SO 1 Building envelope at most 5 at most 20 m
SO 2 Other special area Betreutes Wohnen und Pflege up to 60 % of the area (GRZ 0.6) special at most 6 degrees
SO 2 Building envelope at most 3 at most 11 m
SO2, WA9, WA10, WA13, WA15 Building envelope at most 5 at most 18 m
WA 1, 2, 3, 4, 5 General residential area up to 40 % of the area (GRZ 0.4) at most 2 at most 9 m detached at most 36 degrees
WA 6, 7, 8, 11 General residential area up to 40 % of the area (GRZ 0.4) at most 3 at most 11 m detached at most 6 degrees
WA 9, 10, 13, 15 General residential area up to 40 % of the area (GRZ 0.4) special at most 6 degrees
WA 9, 10, 13, 15 Building envelope at most 4 at most 15 m
WA 12, 14, 16 General residential area up to 40 % of the area (GRZ 0.4) at most 3 at most 11 m special at most 6 degrees

What the map shows

  • General residential area

    For this area the plan sets what may be built and how much.

  • Other special area

    For this area the plan sets what may be built and how much.

  • Building envelope (12)

    Buildings must stand inside the building line. Ancillary structures such as garages may be allowed outside, unless the plan says otherwise. In the plan: Buildable plot area with building line (Section 23 BauNVO).

  • Boundary between different uses (17)

    Separates areas for which the plan sets different uses or dimensions.

  • Green space (16)

    Area that stays green, for example a park, playground or garden.

  • Roads and paths (9)

    Area for roads, paths and squares. In the plan: Traffic area.

  • Road boundary line (13)

    Boundary between road and building plot.

  • Planting of trees and shrubs (51)

    What the plan sets out must be planted here: trees, shrubs or other planting.

  • Keeping trees and shrubs (3)

    What grows here must be kept: trees, shrubs or other planting.

  • Area for nature and landscape

    Nature and landscape must be protected, cared for or developed here.

  • Special purpose

    Area for a specific purpose named in the plan, for example a café. In the plan: Area with a special purpose (Section 9 (1) No. 9 BauGB).

  • Right of way or utility right (3)

    The area must stay accessible for paths or utility lines.

  • Utilities (5)

    Area or line for electricity, water, sewage or similar.

  • Kept free of buildings

    This area must not be built on, for example because a road, railway or utility line is planned here.

  • Monument (2)

    There is a monument here, for example an archaeological site. Building or moving earth here usually needs approval from the heritage authority. In the plan: Area under heritage law.

Only the original plan of the municipality is legally binding. This view is a reading aid. As of 12.10.2026.

Which survey you need and when

For a building project in this area, you usually need these surveys.

  1. Before you buy: clear up the boundaries

    New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots

  2. For the planning: topographic survey plan

    The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan

  3. For the building application: site plan

    It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).

  4. Before building starts: setting out

    We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house

  5. After completion: official building survey

    It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)

Building areas nearby

Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.

All 14 building areas in the municipality of Papendorf

Where the information comes from

Development plans and bylaws
Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 12 October 2026. View this plan in the Bauportal M-V (in German)
Parcels
Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
Background maps
basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.

Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.

Are you planning to build in this area?

We tell you which survey you need and provide the site plan, setting out and official building survey from one office.