Simple development plan (einfacher Bebauungsplan) · In force
BPlan Nr. 4 Hornstorf OT Kritzow Erweiterung Gewerbegebiet 1. Änderung
The development plan covers an area in the municipality of Hornstorf (Kritzow area), Landkreis Nordwestmecklenburg. It has been in force since 7 April 2006. The plan area covers about 5.5 hectares.
There is a newer version: Amendment no. 3, In force since 14 April 2012
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Hornstorf
Village or district Kritzow - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 7 April 2006
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 4
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 5.5 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the simplified procedure under § 13 BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 3, latest version
BPlan Nr. 4 Hornstorf OT Kritzow Erweiterung Gewerbegebiet 3. Änderung
In force since 14 April 2012 about 1.8 ha
-
Amendment no. 2
BPlan Nr. 4 Hornstorf OT Kritzow Erweiterung Gewerbegebiet 2. Änderung
In force since 19 July 2007 about 3.5 ha
-
Amendment no. 1 (this page)
BPlan Nr. 4 Hornstorf OT Kritzow Erweiterung Gewerbegebiet 1. Änderung
In force since 7 April 2006 about 5.5 ha
-
Original version
BPlan Nr. 4 Hornstorf OT Kritzow Erweiterung Gewerbegebiet
In force since 13 October 1994 about 14.0 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 6 Hornstorf OT Rüggow Tierpension Hirschner
In force since 3 August 2005 300 m away
-
Innenbereichssatzung Nr. 1 Hornstorf OT Rüggow 2. Änderung und Ergänzung
In force since 20 May 2020 350 m away 3 versions
-
BPlan Nr. 1 Hornstorf OT Kritzow Gewerbegebiet 3. Änderung
In force since 7 March 2019 500 m away 4 versions
-
Innenbereichssatzung Hornstorf OT Kritzow Süd 1. Änderung
In force since 21 December 2001 750 m away
-
BPlan Nr. 10 Hornstorf OT Hornstorf Industrie- und Gewerbegebiet Wismar-Hornstorf (Teil) 1. Änderung
In force since 18 April 2024 800 m away 2 versions
-
BPlan Nr. 70/08, 00, Wismar, Hansestadt "Gewerbe- und Industriegebiet Kritzowburg Ost"
In progress: Decision to draw up the plan 850 m away Hansestadt Wismar
-
BPlan Nr. 9 Hornstorf OT Rüggow Feriensiedlung Quaduxenbarg
In force since 23 January 2016 850 m away
-
BPlan Nr. 3 Hornstorf OT Hornstorf Wohngebiet am Gärtnerweg 3. Änderung
In force since 5 November 2020 1.1 km away 3 versions
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.