Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 4 Gielow Photovoltaik-Anlage Kieswerk Peenhäuser_PV
The development plan covers an area in the municipality of Gielow (Peenhäuser area), Landkreis Mecklenburgische Seenplatte. It has been in force since 25 February 2018. The plan area covers about 5.1 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Gielow
Village or district Peenhäuser - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 25 February 2018
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 4 - Area
- about 5.1 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For an energy facility in this area, you usually need these surveys.
-
To secure the land: land parcels and owners
We find out which land parcels the project touches and who owns them, from the real estate cadastre (Liegenschaftskataster) and the land register (Grundbuch). Surveying for wind and solar farms
-
For the planning: topographic survey plan
Boundaries, existing features and terrain, for large areas also as a terrain model from a drone flight.
-
For the permit: site plan
Whether it is a building application or an application under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz): the site plan under BauVorlVO M-V is part of it, if needed with the documents for a public easement (Baulast), for example for an access road.
-
Before building starts: setting out
Foundations, fence, module rows, crane pads and access roads, on request during construction.
-
After completion: building survey and as-built records
Official survey where it is required, for example for wind turbines, plus an as-built plan and cable routes. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 6 Gielow Solarpark auf der Deponie Gielow-Ausbau
In progress: Early consultation of authorities 500 m away
-
Vorhabensbezogener BPlan Nr. 2 Gielow Erholung und Freizeitpark Peenhäuser
In force since 21 September 2002 600 m away
-
BPlan Nr. 3 Gielow Gewerbegebiet an der ehemaligen Molkerei
In force since 22 September 2013 850 m away
-
Vorhabensbezogener BPlan Nr. 1 Gielow Gielow, Maschinenhandel
In force since 7 June 1998 950 m away
-
BPlan Nr. 1, 1. Änderung Gielow Am Dornbusch
In force since 2 August 1998 1.5 km away
-
BPlan Nr. 5, 1. Änderung Malchin, Stadt Amselweg
In force since 6 April 2013 3.6 km away Stadt Malchin
-
Vorhabensbezogener BPlan Nr. 28 Malchin, Stadt Lindenstraße
In force since 10 March 2018 3.8 km away Stadt Malchin
-
BPlan Nr. 20 Malchin, Stadt Turnplatz/ Peenegärten
In progress: Draft 3.9 km away Stadt Malchin
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.