The development plan covers an area in Stadt Malchin, Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Draft). The plan area covers about 6,440 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Malchin
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In progress: Draft
- Type of plan
- Development plan (Bebauungsplan)
No. 20 - Area
- about 6,440 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Vorhabensbezogener BPlan Nr. 28 Malchin, Stadt Lindenstraße
In force since 10 March 2018 150 m away
-
BPlan Nr. 5, 1. Änderung Malchin, Stadt Amselweg
In force since 6 April 2013 300 m away
-
BPlan Nr. 24, 2. Änderung Malchin, Stadt Strietfeld
In force since 23 March 2019 350 m away 3 versions
-
BPlan Nr. 4 Malchin, Stadt Scheunenstraße
In force since 2 May 1995 400 m away
-
BPlan Nr. 19 Malchin, Stadt Blockbereich Strelitzer Straße/ Lange Straße/ Petersilienstraße
In force since 9 May 1999 450 m away
-
BPlan Nr. 26, 1. Änderung Malchin, Stadt Blumenstraße
In force since 20 April 2019 450 m away 2 versions
-
BPlan Nr. 3, 3. Änderung Malchin, Stadt Quartierbebauung
In force since 27 January 2018 600 m away 3 versions
-
BPlan Nr. 23, 3. Änderung Malchin, Stadt Fangelturm
In force since 27 January 2018 650 m away 4 versions
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.