Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 63 Teterow, Bergringstadt Handwerk und Wohnen, Vor dem Brink
The development plan covers an area in Bergringstadt Teterow (Pampow area), Landkreis Rostock. It has been in force since 28 January 2020. The plan area covers about 8,310 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Bergringstadt Teterow
Village or district Pampow - District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 28 January 2020
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 63
Accelerated procedure for outlying land (beschleunigtes Verfahren, § 13b BauGB) - Area
- about 8,310 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for outlying land under § 13b BauGB.
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a house in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 26, 1. Änderung Teterow, Bergringstadt SO/GE-Gebiet Niendorfer Furt
In force since 30 July 2000 150 m away
-
BPlan Nr. 15 Teterow, Bergringstadt "Industrie- und Gewerbegebiet Pampow/Koppelberg"
In force since 18 April 1993 700 m away
-
BPlan Nr. 66 A Teterow, Bergringstadt Pampower Weg
In force since 30 August 2022 1.1 km away
-
BPlan Nr. 15, 1. Teterow, Bergringstadt "Industrie- und Gewerbegebiet Pampow/Koppelberg"
In force since 14 November 2010 1.1 km away
-
BPlan Nr. 68 Teterow, Bergringstadt Ehemaliges OGS-Gelände
In force since 5 November 2025 1.2 km away
-
Vorhabensbezogener BPlan Nr. 62 Teterow, Bergringstadt SO NORMA, Malchiner Straße
In force since 6 November 2018 1.3 km away
-
Innenbereichssatzung Nr. 1 Teterow, Bergringstadt Ortslage Pampow
In force since 23 February 1997 1.3 km away
-
BPlan Nr. 52 Teterow, Bergringstadt Glasower Weg
In force since 19 October 2008 1.5 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.