Project-based development plan (vorhabenbezogener Bebauungsplan) · Draft
Vorhabensbezogener BPlan Nr. 13 1. Änderung Lübtheen, Stadt "Einkaufsmarkt Kirchenplatz"
The development plan covers an area in Stadt Lübtheen, Landkreis Ludwigslust-Parchim. It is being drawn up (last known step: Draft). The plan area covers about 4,670 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Stadt Lübtheen
- District
- Ludwigslust-Parchim
Surveying in this region - Legal status
- In progress: Draft
Decision to draw up the plan on 18 June 2026 - Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 13 1. Änderung
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 4,670 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version (this page)
Vorhabensbezogener BPlan Nr. 13 1. Änderung Lübtheen, Stadt "Einkaufsmarkt Kirchenplatz"
In progress: Draft about 4,670 m²
-
Original version
Vorhabensbezogener BPlan Nr. 13 Lübtheen, Stadt "Einkaufsmarkt Kirchenplatz"
In force since 18 June 2015 about 7,210 m²
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 16 Lübtheen, Stadt "Wohngebiet an der Lindenschule" 1.BA
In force since 11 April 2019 600 m away
-
BPlan Nr. 16, 1. Änderung und Erweiterung Lübtheen, Stadt "Wohngebiet an der Lindenschule" 2.BA
In force since 11 May 2023 650 m away
-
BPlan Nr. 05 Lübtheen, Stadt "Industriestraße"
In force since 21 December 2001 650 m away
-
Vorhabensbezogener BPlan Nr. 17 Lübtheen, Stadt "Kindertagesstätte am Mühlenweg"
In force since 11 April 2019 650 m away
-
Vorhabensbezogener BPlan Nr. 07 Lübtheen, Stadt "Betreutes Wohnen Johannesstraße"
In force since 5 October 2002 750 m away
-
Vorhabensbezogener BPlan Nr. 14 Lübtheen, Stadt "Einkaufsmarkt Rudolf-Breitscheid-Str."
In force since 29 October 2015 850 m away
-
BPlan Nr. 08, 3. Änderung Lübtheen, Stadt "Betriebserweiterung Firma Brüggen GmbH"
In progress: Draft 850 m away 4 versions
-
Vorhabensbezogener BPlan Nr. 01-94 Lübtheen, Stadt "Am Lanker Weg"
In force since 29 July 1995 900 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.