Project-based development plan (vorhabenbezogener Bebauungsplan) · Partly no longer valid
Vorhabensbezogener BPlan Nr. 1/2008 Wustrow Uferzone Albertinenlust
The development plan covers an area in the municipality of Wustrow, Landkreis Mecklenburgische Seenplatte. It is in force, but parts of it are no longer valid. The plan area covers about 6,000 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Wustrow
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force, partly no longer valid
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 1/2008 - Area
- about 6,000 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is in force, but parts of it are no longer valid. The municipality or the local building authority (untere Bauaufsichtsbehörde) can tell you which rules still apply to a certain plot.
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 01/95 Wustrow Wohnen in Canow
In force since 18 March 2006 200 m away
-
Vorhabensbezogener BPlan Wustrow Ferienhausgebiet Canow
In force since 9 December 1996 350 m away
-
BPlan Nr. 01/01, Verfahren eingestellt Wustrow Allwetter- Freizeitpark Canow
No longer valid 400 m away
-
Vorhabensbezogener BPlan Nr. 01/2007 Wustrow Wasserwanderrastplatz Canow Käkenort
In force since 10 May 2014 750 m away
-
Innenbereichssatzung Wustrow Entwicklungssatzung_Grünplan_Begründung
In force since 24 October 2010 2.2 km away
-
Innenbereichssatzung Wustrow Abrundungssatzung Neu Canow 1996
In force since 6 December 1996 2.8 km away
-
BPlan Nr. 03/99 Mirow, Stadt Biber-Park Diemitzer Schleuse
In force since 15 July 2006 3.0 km away Stadt Mirow
-
Vorhabensbezogener BPlan Nr. 1/98 Wustrow Erweiterung sozialpäd. Einrichtung Seewalde
In force since 24 October 2000 3.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.