Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 02/2019 Wesenberg, Stadt Gewerbepark Strasen
The development plan covers an area in Stadt Wesenberg (Strasen area), Landkreis Mecklenburgische Seenplatte. It has been in force since 1 October 2023. The plan area covers about 8,600 square metres.
There is a newer version: Amendment no. 1, In progress: Draft
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Wesenberg
Village or district Strasen - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 1 October 2023
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 02/2019 - Area
- about 8,600 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version
Vorhabensbezogener BPlan Nr. 02/2019, 1. Änderung Wesenberg, Stadt Gewerbepark Strasen
In progress: Draft about 8,600 m²
-
Original version (this page)
Vorhabensbezogener BPlan Nr. 02/2019 Wesenberg, Stadt Gewerbepark Strasen
In force since 1 October 2023 about 8,600 m²
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 2/2010 Wesenberg, Stadt Schleusengasse Strasen
In force since 2 July 2011 400 m away
-
BPlan Nr. 02/2010 Wesenberg, Stadt Schleusengasse Strasen, 1.Änderung
In progress: Consultation of authorities 400 m away
-
BPlan Nr. 01/20 Wesenberg, Stadt Prieperter Landstraße
In progress: Draft 400 m away
-
BPlan Wesenberg, Stadt Ferienhäuser am Ellbogensee
In force since 15 February 2000 500 m away
-
In force since 17 June 2006 550 m away
-
BPlan Nr. 1/96 Wesenberg, Stadt Wohnbaustandort Strasen
In force since 13 November 1997 550 m away
-
Vorhabensbezogener BPlan Nr. 01/2002 Wesenberg, Stadt Feriendorf Strasen- Ellbogensee
In force since 15 August 2004 750 m away
-
Vorhabensbezogener BPlan Nr. 1/2010 Wesenberg, Stadt Solaranlage Strasen
In force since 23 October 2010 950 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.