Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 8 Rosenow Sondergebiet Einzelhandel, Alte Molkerei
The development plan covers an area in the municipality of Rosenow, Landkreis Mecklenburgische Seenplatte. It has been in force since 17 November 2024. The plan area covers about 5,360 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Rosenow
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 17 November 2024
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 8
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 5,360 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a shop or commercial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 2 Rosenow Wohnpark, Alte Molkerei
In force since 23 September 2017 under 100 m away
-
BPlan Rosenow B-Plan Nr. 1 Gewerbepark Süd
In force since 22 August 1994 250 m away
-
Innenbereichssatzung Rosenow Klarstellungs- und Ergänzungssatzung Rosenow
In force since 16 March 2002 250 m away
-
BPlan Nr. 1 Rosenow Gewerbepark Süd
In force since 22 August 1994 250 m away
-
BPlan Nr. 7 Rosenow An der Schulstrasse
In force since 2 June 2006 300 m away
-
BPlan Nr. 5, 1. Änderung Rosenow Mischgebiet Ost
In force since 23 July 2011 600 m away 2 versions
-
BPlan Rosenow B-Plan Nr. 5, 1. Änderung MI Ost
In force since 24 July 2011 700 m away
-
BPlan Nr. 1, 1. Änderung Knorrendorf Allgemeines Wohngebiet an der Straße Kleeth/Bahnhof-Kastorf
In force since 26 April 1999 1.9 km away Knorrendorf
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.