Project-based development plan (vorhabenbezogener Bebauungsplan) · Decision to draw up the plan
Vorhabensbezogener BPlan Nr. 42 Neubrandenburg, Vier-Tore-Stadt Fischerhof Nonnenhof
The development plan covers an area in Vier-Tore-Stadt Neubrandenburg, Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Decision to draw up the plan). The plan area covers about 9,920 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Vier-Tore-Stadt Neubrandenburg
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In progress: Decision to draw up the plan
Decision to draw up the plan on 8 May 2013 - Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 42 - Area
- about 9,920 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Decision to draw up the plan. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 4 b Groß Nemerow Feriendorf Tollenseheim
In force since 18 October 2008 550 m away Groß Nemerow
-
BPlan Nr. 4b, 2. Änderung Groß Nemerow Feriendorf Tollenseheim
In force since 19 January 2019 550 m away Groß Nemerow 2 versions
-
BPlan Nr. 12 Penzlin, Stadt Hafen Wustrow
In progress: Draft 1.4 km away Stadt Penzlin
-
Vorhabensbezogener BPlan Nr. 1 Groß Nemerow Bornmühle
In force since 18 January 1993 1.5 km away Groß Nemerow
-
BPlan Nr. 4a Groß Nemerow Golfplatz an der Bornmühle
In force since 26 June 2001 1.5 km away Groß Nemerow
-
Vorhabensbezogener BPlan Nr. 13 Penzlin, Stadt Caravanplatz in Wustrow
In progress: Draft 1.7 km away Stadt Penzlin
-
BPlan Nr. 9 Groß Nemerow Erweiterung Golfanlage Mecklenburg-Strelitz
In force since 15 October 2010 1.8 km away Groß Nemerow
-
Innenbereichssatzung Groß Nemerow Groß Nemerow Abrundungssatzung Dorf Krickow
In force since 24 June 1999 2.0 km away Groß Nemerow
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.