Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 43 Neubrandenburg, Vier-Tore-Stadt Erweiterung Supermarkt Salvador-Allende-Straße 15
The development plan covers an area in Vier-Tore-Stadt Neubrandenburg, Landkreis Mecklenburgische Seenplatte. It has been in force since 29 May 2019. The plan area covers about 7,460 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Vier-Tore-Stadt Neubrandenburg
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 29 May 2019
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 43 - Area
- about 7,460 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a shop or commercial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Vorhabensbezogener BPlan Nr. 54 Neubrandenburg, Vier-Tore-Stadt Juri-Gagarin-Ring/Kopernikusstraße
In progress: Decision to draw up the plan 400 m away
-
BPlan Nr. 84 Neubrandenburg, Vier-Tore-Stadt Wohnquartier Leibnizstraße/Keplerstraße
In progress: Decision to draw up the plan 450 m away
-
BPlan Nr. 118 Neubrandenburg, Vier-Tore-Stadt Einzelhandel Oststadt
In force since 30 September 2020 450 m away
-
BPlan Nr. 107 Neubrandenburg, Vier-Tore-Stadt Juri-Gagarin-Ring/Kopernikusstraße
In force since 25 July 2012 450 m away
-
BPlan Nr. 90.1 Neubrandenburg, Vier-Tore-Stadt Badehaus
No longer in force 550 m away
-
BPlan Nr. 49 Neubrandenburg, Vier-Tore-Stadt Kinder- und Jugendzentrum Hinterste Mühle, 1. Änderung
In progress: Decision to draw up the plan 750 m away 2 versions
-
BPlan Nr. 60 Neubrandenburg, Vier-Tore-Stadt Eigenheimsiedlung Kiessee
In progress: Decision to draw up the plan 750 m away
-
BPlan Nr. 8 Neubrandenburg, Vier-Tore-Stadt Spargelberg
In force since 27 January 1993 800 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.