Project-based development plan (vorhabenbezogener Bebauungsplan) · In force
Vorhabensbezogener BPlan Nr. 1/1 Dobbin-Linstow Ferienparadies Linstow
The development plan covers an area in the municipality of Dobbin-Linstow (Linstow area), Landkreis Rostock. It has been in force since 12 August 2007. The plan area covers about 64.2 hectares.
There is a newer version: Amendment no. 2, In force since 15 October 2022
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Dobbin-Linstow
Village or district Linstow - District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 12 August 2007
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 1/1 - Area
- about 64.2 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
For a holiday or leisure project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version
Vorhabensbezogener BPlan Nr. 1/1 Dobbin-Linstow Ferienparadies Linstow 2. Änderung
In force since 15 October 2022 about 13.9 ha
-
Amendment no. 1
Vorhabensbezogener BPlan Nr. 1/1 Dobbin-Linstow Ferienparadies Linstow 1. Änderung
In force since 16 November 2019 about 8,200 m²
-
Original version (this page)
Vorhabensbezogener BPlan Nr. 1/1 Dobbin-Linstow Ferienparadies Linstow
In force since 12 August 2007 about 64.2 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Vorhabensbezogener BPlan Nr. 3 Dobbin-Linstow Autohof Hechtschwanz
In progress: Decision to draw up the plan 700 m away
-
In progress: Decision to draw up the plan 1.3 km away
-
Innenbereichssatzung Dobbin-Linstow OT Linstow
In force since 9 June 2002 1.3 km away
-
Vorhabensbezogener BPlan Nr. 2 Dobbin-Linstow Atelierhaus Frauke Eigen OT Dobbin
In force since 10 January 2015 2.4 km away
-
BPlan Nr. 5 Dobbin-Linstow OT Zietlitz Photovoltaikanlage Kieswerk
In force since 15 August 2020 2.4 km away
-
In force since 15 June 2024 2.5 km away
-
Innenbereichssatzung Dobbin-Linstow OT Dobbin
No longer valid 2.5 km away
-
Aussenbereichssatzung Dobbin-Linstow OT Bornkrug
In force since 14 March 1999 2.8 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.