Project-based development plan (vorhabenbezogener Bebauungsplan) · No longer in force
Vorhabensbezogener BPlan Nr. 4 Boldekow "SO Photovoltaik Borntin"
The development plan covers an area in the municipality of Boldekow (Borntin area), Landkreis Vorpommern-Greifswald. It is no longer in force. The plan area covers about 50.4 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Boldekow
Village or district Borntin - District
- Vorpommern-Greifswald
Surveying in this region - Legal status
- No longer in force
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 4 - Area
- about 50.4 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Not under this development plan any more. What may be built on the land depends on a newer plan. If there is none, the general rules of the Federal Building Code (Baugesetzbuch) apply: for built-up areas (Innenbereich, § 34 BauGB) or for outlying areas (Außenbereich, § 35 BauGB).
You get a binding answer with a preliminary building enquiry (Bauvoranfrage) at the local building authority (untere Bauaufsichtsbehörde).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
Before you build or buy here, it is worth clearing up these points.
-
Find out if you can build
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain and helps with a preliminary building enquiry (Bauvoranfrage). Topographic survey plan
-
Check the boundaries
We tell you whether the boundaries of your plot have been officially determined, and we check existing boundary marks on site. Boundaries and plots
-
Build
For your project we make the site plan and the setting out and survey the finished building. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Boldekow OT Borntin
In progress: Draft 650 m away
-
Innenbereichssatzung Boldekow OT Rubenow
In progress: Draft 2.3 km away
-
BPlan Nr. 31 Friedland, Stadt Photovoltaikanlage Kiesgrube Ramelow_PV
In force since 26 October 2017 2.5 km away Stadt Friedland
-
Vorhabensbezogener BPlan Nr. 8 Spantekow "Solarpark Rebelow"
In progress: Decision to draw up the plan 2.8 km away Spantekow
-
Vorhabensbezogener BPlan Nr. 4 Spantekow "Solarpark Drewelow"
In progress: Draft 2.9 km away Spantekow
-
Aussenbereichssatzung Boldekow OT Zinzow/ Kiekut
In force since 17 February 2011 3.1 km away
-
Vorhabensbezogener BPlan Nr. 12 Spantekow Solarpark Spantekow Süd
In progress: Decision to draw up the plan 3.3 km away Spantekow
-
BPlan Nr. 1 Spantekow Wohngebiet An der Mühlenstr.
In force since 30 January 1997 3.6 km away Spantekow
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.