Project-based development plan (vorhabenbezogener Bebauungsplan) · No longer valid
Vorhabensbezogener BPlan Nr. 15 Altentreptow, Stadt Vorhabenbezogener B-Plan Altentreptow, Stadt Biogasanlage Thalberg Nr. 15
The development plan covers an area in Stadt Altentreptow (null area), Landkreis Mecklenburgische Seenplatte. It is no longer valid. The plan area covers about 1.6 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 12 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 12 October 2026
- Location
- Stadt Altentreptow
Village or district null - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- No longer valid
- Type of plan
- Project-based development plan (vorhabenbezogener Bebauungsplan)
No. 15 - Area
- about 1.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Not under this development plan any more. What may be built on the land depends on a newer plan. If there is none, the general rules of the Federal Building Code (Baugesetzbuch) apply: for built-up areas (Innenbereich, § 34 BauGB) or for outlying areas (Außenbereich, § 35 BauGB).
You get a binding answer with a preliminary building enquiry (Bauvoranfrage) at the local building authority (untere Bauaufsichtsbehörde).
What is a project-based development plan?
It applies to one specific project. A developer carries out the project according to a plan agreed with the municipality and commits to this in an implementation contract (Durchführungsvertrag, § 12 BauGB).
Which survey you need and when
Before you build or buy here, it is worth clearing up these points.
-
Find out if you can build
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain and helps with a preliminary building enquiry (Bauvoranfrage). Topographic survey plan
-
Check the boundaries
We tell you whether the boundaries of your plot have been officially determined, and we check existing boundary marks on site. Boundaries and plots
-
Build
For your project we make the site plan and the setting out and survey the finished building. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
In force since 7 March 2020 under 100 m away
-
In progress: Draft 200 m away
-
Vorhabensbezogener BPlan Nr. 48 Altentreptow, Stadt Batteriespeicheranlage in Altentreptow, Thalberg
In progress: Early public consultation 300 m away
-
Vorhabensbezogener BPlan Nr. 45 Altentreptow, Stadt Batteriespeicher Thalberg Ursprungsplan
In progress: Draft 350 m away
-
In force since 7 January 1999 600 m away
-
In progress: Draft 600 m away
-
In progress: Early consultation of authorities 900 m away
-
In force since 7 December 1994 1.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 12 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.