Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung) · In force
Innenbereichssatzung Penzlin, Stadt Klarstellungs- und Einbeziehungssatzung Gartenweg / Neue Straße der Stadt Penzlin, 1.Änderung
The bylaw covers an area in Stadt Penzlin, Landkreis Mecklenburgische Seenplatte. It has been in force since 10 April 2018. The plan area covers about 3.1 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Penzlin
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 10 April 2018
- Type of plan
- Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung)
No. 0
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 3.1 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the bylaw using the simplified procedure under § 13 BauGB.
What is a clarification bylaw?
It sets the limits of the built-up part of a town or village (§ 34 Abs. 4 Satz 1 Nr. 1 BauGB). Inside these limits, what you may build depends on the buildings around it.
What is a supplementary bylaw?
It adds single pieces of land from the outlying area to the built-up part of a town or village, if the buildings next to them shape their character (§ 34 Abs. 4 Satz 1 Nr. 3 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version (this page)
Innenbereichssatzung Penzlin, Stadt Klarstellungs- und Einbeziehungssatzung Gartenweg / Neue Straße der Stadt Penzlin, 1.Änderung
In force since 10 April 2018 about 3.1 ha
-
Original version
In force since 18 March 2008 about 3.1 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
In force since 22 April 2024 200 m away
-
BPlan Nr. 10 Penzlin, Stadt Am großen Stadtsee I
In force since 4 October 2005 550 m away
-
BPlan Nr. 11. Änderung Penzlin, Stadt Am großen Stadtsee
In force since 5 November 2018 550 m away
-
BPlan Nr. 18 Penzlin, Stadt Wohngebiet an der Kälberkoppel
Adopted as a bylaw 550 m away
-
BPlan Nr. 21 Penzlin, Stadt Wohngebiet Alte Gärtnerei Penzlin
In force since 15 February 2022 650 m away
-
BPlan Nr. 6 Penzlin, Stadt Wohngebiet Döring II
In force since 27 July 1994 750 m away
-
BPlan Nr. 6, 1.Änderung Penzlin, Stadt Döring II
In progress: Draft 750 m away
-
Vorhabensbezogener BPlan Nr. 19 Penzlin, Stadt Wohngebiet Am Kollofskamp
In force since 17 November 2020 950 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.