Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung) · Decision to draw up the plan
Innenbereichssatzung Nr. (0/1) Brunow Satzung zur Aufhebung der Satzung der Gemeinde Brunow über die Klarstellung und Abrundung des im Zusammenhang bebauten Ortteiles Brunow einschl. 1. Änderung Brunow Aufhebung
The bylaw covers an area in the municipality of Brunow, Landkreis Ludwigslust-Parchim. It is being drawn up (last known step: Decision to draw up the plan). The plan area covers about 21.0 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Brunow
- District
- Ludwigslust-Parchim
Surveying in this region - Legal status
- In progress: Decision to draw up the plan
Decision to draw up the plan on 24 June 2026 - Type of plan
- Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung)
No. (0/1)
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 21.0 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this bylaw. The municipality is still drawing it up. The last known step is: Decision to draw up the plan. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the bylaw will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the bylaw using the simplified procedure under § 13 BauGB.
What is a clarification bylaw?
It sets the limits of the built-up part of a town or village (§ 34 Abs. 4 Satz 1 Nr. 1 BauGB). Inside these limits, what you may build depends on the buildings around it.
What is a supplementary bylaw?
It adds single pieces of land from the outlying area to the built-up part of a town or village, if the buildings next to them shape their character (§ 34 Abs. 4 Satz 1 Nr. 3 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Nr. (0/1) Brunow Klarstellungs- und Abrundungssatzung 1. Änderung
In force since 18 May 2004 under 100 m away
-
In progress: Decision to draw up the plan under 100 m away
-
BPlan Nr. (1) Dambeck "Sondergebiet Solarpark Dambeck Ursprungsplan
In progress: Decision to draw up the plan 3.1 km away Dambeck
-
Innenbereichssatzung Nr. (0/1) Dambeck Klarstellungs- und Ergänzungssatzung Dambeck
In force since 17 August 2005 3.6 km away Dambeck
-
Innenbereichssatzung Nr. (0/2) Brunow Klarstellungssatzung Ortsteil Klüß Ursprungsplan
In force since 13 December 2005 3.7 km away
-
Innenbereichssatzung Ziegendorf OT Drefahl
In force since 30 May 1996 4.5 km away Ziegendorf
-
Vorhabensbezogener BPlan Nr. 12 Ziegendorf OT Meierstorf/Drefahl "Solarpark Meierstorf Drefahl"
In progress: Draft 4.7 km away Ziegendorf
-
Vorhabensbezogener BPlan Nr. 16 Ziegendorf OT Meierstorf "Batteriepark Ziegendorf inkl. Umspannwerk"
In progress: Decision to draw up the plan 5.1 km away Ziegendorf
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.