Inner area bylaw (Innenbereichssatzung) · In force
Innenbereichssatzung Klein Trebbow OT Groß Trebbow 1. Ergänzung
The bylaw covers an area in the municipality of Klein Trebbow (Groß Trebbow area), Landkreis Nordwestmecklenburg. It has been in force since 16 February 2000. The plan area covers about 3,040 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Klein Trebbow
Village or district Groß Trebbow - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 16 February 2000
- Type of plan
- Inner area bylaw (Innenbereichssatzung)
No. 0 - Area
- about 3,040 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is an inner area bylaw?
With it the municipality decides which land belongs to the built-up part of a town or village (§ 34 Abs. 4 BauGB). There a project is allowed if it fits in with the character of the buildings around it and access and services are secured (§ 34 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version (this page)
Innenbereichssatzung Klein Trebbow OT Groß Trebbow 1. Ergänzung
In force since 16 February 2000 about 3,040 m²
-
Original version
Innenbereichssatzung Klein Trebbow OT Groß Trebbow
In force since 24 April 1998 about 7.2 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 19 Klein Trebbow OT Klein Trebbow Alter Gutshof 3. Änderung
In force since 14 May 2014 750 m away 4 versions
-
BPlan Nr. 18 Klein Trebbow OT Klein Trebbow Allgemeines Wohngebiet Süd 3. Änderung
In force since 21 May 2014 800 m away 4 versions
-
BPlan Nr. 17 Klein Trebbow OT Klein Trebbow Allgemeines Wohngebiet Am Flasslandssoll 2. Änderung
In force since 9 May 2003 900 m away 3 versions
-
Vorhabensbezogener BPlan Nr. 26 Klein Trebbow Solarpark Trebbow
In force since 6 March 2026 1.7 km away
-
Vorhabensbezogener BPlan Nr. 24 Klein Trebbow Solarpark Pingelshagen
In force since 15 August 2025 2.0 km away
-
Vorhabensbezogener BPlan Nr. 27 Klein Trebbow Agri-PV Moorhof
In progress: Decision to draw up the plan 2.1 km away
-
Vorhabensbezogener BPlan Nr. 5 Pingelshagen Solarpark Pingelshagen
In force since 5 November 2025 2.2 km away Pingelshagen
-
Innenbereichssatzung Klein Trebbow OT Moorbrink
In force since 21 September 2014 2.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.