Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung) · In force
Innenbereichssatzung Nr. 1. Änderung Datzetal Klarstellungs- und Ergänzungssatzung OT Roga
The bylaw covers an area in the municipality of Datzetal (Roga area), Landkreis Mecklenburgische Seenplatte. It has been in force since 2 October 2015. The plan area covers about 6.8 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Datzetal
Village or district Roga - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 2 October 2015
- Type of plan
- Clarification bylaw (Klarstellungssatzung) and Supplementary bylaw (Ergänzungssatzung)
No. 0, 1. Änderung
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 6.8 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the bylaw using the simplified procedure under § 13 BauGB.
What is a clarification bylaw?
It sets the limits of the built-up part of a town or village (§ 34 Abs. 4 Satz 1 Nr. 1 BauGB). Inside these limits, what you may build depends on the buildings around it.
What is a supplementary bylaw?
It adds single pieces of land from the outlying area to the built-up part of a town or village, if the buildings next to them shape their character (§ 34 Abs. 4 Satz 1 Nr. 3 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Datzetal erweiterte Abrundungssatzung für den Ortsteil Roga
In force since 10 June 1997 under 100 m away
-
BPlan Nr. 1 Datzetal OT Roga Biogaspark
In force since 27 October 2011 800 m away
-
BPlan Nr. 1, 1. Änderung Datzetal Biogaspark Roga
In force since 26 September 2020 800 m away
-
Innenbereichssatzung Brunn Roggenhagen Ursprungsplan
In force since 29 June 2026 3.5 km away Brunn
-
In force since 28 June 2026 3.5 km away Brunn
-
Innenbereichssatzung Brunn Aufhebung der Abrundungssatzung für die Ortslage Roggenhagen
In force since 28 June 2026 3.5 km away Brunn
-
BPlan Nr. 36 Friedland, Stadt Photovoltaikanlage westlich der B 197_PV
In force since 28 March 2026 3.7 km away Stadt Friedland
-
BPlan Nr. 3 Datzetal Photovoltaikanlage Salow, Werk 1_PV
In force since 12 June 2013 4.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.