Development plan (Bebauungsplan) · In force
BPlan Nr. 6 Poppendorf Wohngebiet an der Dorfstraße Ursprungsplan
The development plan covers an area in the municipality of Poppendorf, Landkreis Rostock. It has been in force since 25 March 2023. The plan area covers about 1.6 hectares.
There is a newer version: Original version, In force since 25 March 2026
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 26 November 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 26 November 2026
- Location
- Poppendorf
- District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 25 March 2023
- Type of plan
- Development plan (Bebauungsplan)
No. 6
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 1.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a house in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Original version, latest version
BPlan Nr. 6 Poppendorf Wohngebiet an der Dorfstraße Ursprungsplan
In force since 25 March 2026 about 1.6 ha
-
Original version (this page)
BPlan Nr. 6 Poppendorf Wohngebiet an der Dorfstraße Ursprungsplan
In force since 25 March 2023 about 1.6 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 6 Poppendorf Wohngebiet an der Dorfstraße
In force since 25 March 2023 under 100 m away
-
BPlan Nr. 1 Poppendorf Wohngebiet Fasanenberg 6. Änderung 6. Änderung
In force since 21 December 2011 200 m away
-
BPlan Nr. 1 Poppendorf Wohngebiet Fasanenberg Ursprungsplan
In force since 25 May 1994 200 m away
-
Innenbereichssatzung Poppendorf Poppendorf 1. Änderung 1. Änderung
In force since 13 December 2024 250 m away
-
Innenbereichssatzung Poppendorf Poppendorf Ursprungsplan
In force since 18 December 2004 250 m away
-
BPlan Nr. 3-1 Poppendorf Erweiterung des Wohngebietes Fasanenberg 1. Änderung 1. Änderung
In force since 20 November 2006 300 m away
-
BPlan Nr. 3-1 Poppendorf Erweiterung des Wohngebietes Fasanenberg Ursprungsplan
In force since 21 August 2003 300 m away
-
BPlan Nr. 3-2 Poppendorf Gebietserweiterung des Wohngebietes Poppendorf-Fasanenberg
In force since 19 March 2022 400 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 26 November 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.