Development plan (Bebauungsplan) · Early public consultation
BPlan Nr. 46 Hagenow, Stadt Gewerbestandort Viez Lindenstraße Ursprungsplan
The development plan covers an area in Stadt Hagenow (Viez area), Landkreis Ludwigslust-Parchim. It is being drawn up (last known step: Early public consultation). The plan area covers about 3.8 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 5 November 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 5 November 2026
- Location
- Stadt Hagenow
Village or district Viez - District
- Ludwigslust-Parchim
Surveying in this region - Legal status
- In progress: Early public consultation
- Type of plan
- Development plan (Bebauungsplan)
No. 46 - Area
- about 3.8 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Early public consultation. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 6 Hagenow, Stadt Viez, Am Mühlenkamp 1. Änderung 1. Änderung
In force since 1 February 2008 500 m away
-
BPlan Nr. 6 Hagenow, Stadt Viez, Am Mühlenkamp Ursprungsplan
In force since 21 April 1994 500 m away
-
Innenbereichssatzung Hagenow, Stadt Viez 1. Änderung 1. Änderung
In force since 1 February 2008 600 m away
-
Innenbereichssatzung Hagenow, Stadt Viez Ursprungsplan
In force since 1 June 1995 600 m away
-
Innenbereichssatzung Gammelin OT Gammelin und Bakendorf
In force since 21 April 1998 2.7 km away Gammelin
-
BPlan Nr. 12 Hagenow, Stadt Gewerbegebiet Sudenhof 2. Änderung 2. Änderung
In force since 1 April 2013 3.1 km away 2 versions
-
BPlan Nr. 12 Hagenow, Stadt Gewerbegebiet Sudenhof Ursprungsplan
In force since 26 February 1998 3.1 km away
-
Aussenbereichssatzung Hagenow, Stadt Scharbow Ursprungsplan
In force since 18 October 2018 3.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 5 November 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.