Simple development plan (einfacher Bebauungsplan) · Draft
BPlan Nr. 34, 1. Änderung Dassow, Stadt "An der Bahnhofstraße"
The development plan covers an area in Stadt Dassow, Landkreis Nordwestmecklenburg. It is being drawn up (last known step: Draft). The plan area covers about 7,610 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 5 November 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 5 November 2026
- Location
- Stadt Dassow
- District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In progress: Draft
Decision to draw up the plan on 30 June 2026 - Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 34 - 1. Änderung
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 7,610 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 34 Dassow, Stadt OT Dassow Kindertagesstätte ehemaliges Schwimmbad
In force since 28 May 2016 under 100 m away
-
In progress: Draft under 100 m away
-
In force since 20 June 2006 300 m away 2 versions
-
In force since 15 June 2006 300 m away 4 versions
-
BPlan Nr. 20 Dassow, Stadt OT Dassow Wohngebiet an der Schillerstr. 2. Änderung
In force since 1 May 2010 450 m away 3 versions
-
Innenbereichssatzung Dassow, Stadt OT Dassow Teilgartenstraße 3
In force since 24 November 2023 450 m away
-
BPlan Nr. 30 Dassow, Stadt OT Lütgenhof Westl. Hermann-Litzendorf-Str.
In force since 29 September 2017 450 m away
-
BPlan Nr. 23 Dassow, Stadt OT Dassow Ortstzentrum
In force since 27 October 2017 550 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 5 November 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.