Simple development plan (einfacher Bebauungsplan) · Draft
BPlan Nr. 28 Hohenkirchen OT Hohen Wieschendorf für das Gebiet "Dorfmitte" 1. Änderung
The development plan covers an area in the municipality of Hohenkirchen (Hohen Wieschendorf area), Landkreis Nordwestmecklenburg. It is being drawn up (last known step: Draft). The plan area covers about 670 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Hohenkirchen
Village or district Hohen Wieschendorf - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In progress: Draft
Decision to draw up the plan on 4 November 2025 - Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 28
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 670 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 28 Hohenkirchen OT Hohen Wieschendorf Dorfmitte
In force since 22 May 2023 under 100 m away
-
BPlan Nr. 22 Hohenkirchen OT Hohen Wieschendorf Nord
In force since 6 June 2014 200 m away
-
BPlan Nr. 6 Hohenkirchen OT Hohen Wieschendorf Gebiet zwischen Ortslage und Golfplatz
In force since 22 August 1994 300 m away
-
BPlan Nr. 34 Hohenkirchen ehemaliges Golfhotel
In progress: Draft 500 m away
-
BPlan Nr. 27 Hohenkirchen OT Hohen Wieschendorf Anleger
In force since 27 November 2019 750 m away
-
BPlan Nr. 9 Hohenkirchen OT Beckerwitz Wohn- und Ferienpark
In force since 2 September 1998 1.0 km away
-
Vorhabensbezogener BPlan Nr. 15 Hohenkirchen OT Beckerwitz Alte Büdnerei
In force since 8 July 2007 1.2 km away
-
Innenbereichssatzung Hohenkirchen OT Beckerwitz
In force since 14 May 2006 1.5 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.