Development plan (Bebauungsplan) · In force
BPlan Neuenkirchen Storchennest 2. Änderung 2. Änderung
The development plan covers an area in the municipality of Neuenkirchen (Ihlenfeld area), Landkreis Mecklenburgische Seenplatte. It has been in force since 21 February 2026. The plan area covers about 2.8 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Neuenkirchen
Village or district Ihlenfeld - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 21 February 2026
- Type of plan
- Development plan (Bebauungsplan)
No. 0 - Area
- about 2.8 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version (this page)
BPlan Neuenkirchen Storchennest 2. Änderung 2. Änderung
In force since 21 February 2026 about 2.8 ha
-
Amendment no. 1
BPlan Neuenkirchen Storchennest 1. Änderung 1. Änderung
In force since 25 September 2022 about 2.8 ha
-
Amendment no. 1
BPlan Neuenkirchen Storchennest 1. Änderung
In force since 25 September 2022 about 2.8 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Neuenkirchen Storchennest Ursprungsplan
In force since 10 September 1996 under 100 m away
-
Sonstiger Plan Neuenkirchen Ortskern des Ortsteiles Ihlenfeld, Teilbereiche 1 und 2
In force since 22 April 2001 300 m away
-
BPlan Neuenkirchen Umfeld Kita Ihlenfeld
In force since 21 June 2009 350 m away
-
Vorhabensbezogener BPlan Neuenkirchen Solarpark am Bahndamm nordwestlich von Ihlenfeld_PV
In force since 30 January 2022 550 m away
-
BPlan Neuenkirchen Ihlenfeld-Nord 4. Änderung 4. Änderung
In force since 24 January 2026 550 m away 4 versions
-
BPlan Neuenkirchen Ihlenfeld-Nord Ursprungsplan
In force since 26 November 1992 550 m away
-
Vorhabensbezogener BPlan Nr. 51 Neubrandenburg, Vier-Tore-Stadt Photovoltaikanlage an der Südstraße
In progress: Decision to draw up the plan 2.0 km away Vier-Tore-Stadt Neubrandenburg
-
BPlan Nr. 19.1 Neubrandenburg, Vier-Tore-Stadt Ehemaliges Reifenwerk
In force since 13 June 2001 2.2 km away Vier-Tore-Stadt Neubrandenburg
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.