Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet am Poppelberg 3. Änderung
The development plan covers an area in Stadt Wolgast, Landkreis Vorpommern-Greifswald. It has been in force since 16 April 2015. The plan area covers about 49.0 hectares.
There is a newer version: Amendment no. 6, In force since 18 November 2023
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Wolgast
- District
- Vorpommern-Greifswald
Surveying in this region - Legal status
- In force since 16 April 2015
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 8
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 49.0 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the simplified procedure under § 13 BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 6, latest version
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet Am Poppelberg 6. Änderung
In force since 18 November 2023 about 5.5 ha
-
Amendment no. 5
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet am Poppelberg 5. Änderung
In force since 12 October 2019 about 3.4 ha
-
Amendment no. 3 (this page)
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet am Poppelberg 3. Änderung
In force since 16 April 2015 about 49.0 ha
-
Amendment no. 2
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet am Poppelberg 2. Änderung
In force since 15 March 2011 about 49.0 ha
-
Amendment no. 1
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet am Poppelberg 1. Änderung
In force since 24 July 2003 about 49.0 ha
-
Original version
BPlan Nr. 8 Wolgast, Stadt Gewerbegebiet am Poppelberg
In force since 6 April 2000 about 49.0 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 8 Wolgast, Stadt OT Tannenkamp, Gewerbegebiet am Poppelberg, 4. Änderung
No longer valid 100 m away
-
BPlan Nr. 42 Wolgast, Stadt Wohngebiet Mittelfeld, südlich der Waldstraße
In progress: Draft 650 m away
-
BPlan Nr. 2 Wolgast, Stadt Am Katharinenberg
In force since 19 November 1998 900 m away
-
BPlan Nr. 7 Wolgast, Stadt OT Tannenkamp Am Tannenkamp 3. Änderung
In force since 16 May 2013 1.0 km away 2 versions
-
BPlan Nr. 12 Wolgast, Stadt Tannenkamp II
In force since 18 January 1995 1.0 km away
-
BPlan Nr. 36 Wolgast, Stadt Schulcampus an der Schulstraße
In progress: Decision to draw up the plan 1.1 km away
-
BPlan Nr. 15 Wolgast, Stadt Peeneblick am Katharinenberg
In force since 12 October 2000 1.1 km away
-
BPlan Nr. 7 Wolgast, Stadt "Am Tannenkamp"
In force since 12 December 1996 1.1 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.