Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 01/92. Änderung, Wismar, Hansestadt "Gewerbegebiet Hoher Damm"
The development plan covers an area in Hansestadt Wismar, Landkreis Nordwestmecklenburg. It has been in force since 5 February 2012. The plan area covers about 560 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Hansestadt Wismar
- District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 5 February 2012
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 01/90, 2. Änderung,
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 560 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the simplified procedure under § 13 BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 92, latest version (this page)
BPlan Nr. 01/92. Änderung, Wismar, Hansestadt "Gewerbegebiet Hoher Damm"
In force since 5 February 2012 about 560 m²
-
Amendment no. 91
BPlan Nr. 01/91. Änderung, Wismar, Hansestadt "Gewerbegebiet Hoher Damm"
In force since 27 August 2000 about 3,000 m²
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 57/01, 00, Wismar, Hansestadt "Gewerbegebiet Redentin Süd"
In force since 21 November 2004 150 m away
-
BPlan Nr. 01/900. Wismar, Hansestadt "Gewerbegebiet Hoher Damm"
In force since 14 June 1992 150 m away
-
In force since 22 September 2018 250 m away
-
BPlan Nr. 48/18, 00, Wismar, Hansestadt "Wohngebiet Alte Gärtnerei am Hohen Damm"
In progress: Decision to draw up the plan 400 m away
-
BPlan Nr. 02/94. Änderung, Wismar, Hansestadt "Gewerbe- und Sondergebiet Redentin"
In force since 23 January 2011 550 m away 3 versions
-
BPlan Nr. 02/900, Wismar, Hansestadt "Gewerbe- und Sondergebiet Redentin"
In force since 5 July 1998 700 m away
-
BPlan Nr. 21/91 Wismar, Hansestadt "Gewerbegebiet Haffeld Nord"
In force since 22 October 2006 900 m away
-
BPlan Nr. 19/91/6 Wismar, Hansestadt "Wohn- und Mischgebiet Redentin Südwest"
In progress: Decision to draw up the plan 950 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.