Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 46/97, 2. Änderung, Wismar, Hansestadt "Gewerbe- und Industriegebiet Haffeld Süd III"
The development plan covers an area in Hansestadt Wismar, Landkreis Nordwestmecklenburg. It has been in force since 25 September 2021. The plan area covers about 2.6 hectares.
There is a newer version: Amendment no. 3, In progress: Decision to draw up the plan
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Hansestadt Wismar
- District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 25 September 2021
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 46/97, 2. Änderung, - Area
- about 2.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 3, latest version
BPlan Nr. 46/97, 3. Änderung, Wismar, Hansestadt "Gewerbe- und Industriegebiet Haffeld Süd III"
In progress: Decision to draw up the plan about 115 ha
-
Amendment no. 2 (this page)
BPlan Nr. 46/97, 2. Änderung, Wismar, Hansestadt "Gewerbe- und Industriegebiet Haffeld Süd III"
In force since 25 September 2021 about 2.6 ha
-
Amendment no. 1
BPlan Nr. 46/97, 1. Änderung, Wismar, Hansestadt "Gewerbe- und Industriegebiet Haffeld Süd III"
In force since 22 October 2006 about 55.5 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 46/97, 00, Wismar, Hansestadt Gewerbe- und Industriegebiet Haffeld Süd III
In force since 5 December 1999 250 m away
-
BPlan Nr. 41/96,00, Wismar, Hansestadt "Industriegebiet Haffeld Süd I"
In force since 26 September 1999 750 m away
-
BPlan Nr. 40/96, 00, Wismar, Hansestadt "Gewerbegebiet Haffeld Süd II"
In force since 24 September 2000 750 m away
-
BPlan Nr. 21/91 Wismar, Hansestadt "Gewerbegebiet Haffeld Nord"
In force since 22 October 2006 750 m away
-
BPlan Nr. 45/97, 1. Änderung Wismar, Hansestadt "Industriegebiet Haffeld Süd II"
In force since 25 April 2015 800 m away
-
BPlan Nr. 45/97, 00, Wismar, Hansestadt "Industriegebiet Haffeld Süd II"
In force since 23 January 2000 900 m away
-
BPlan Nr. 39/96, 1. Änderung Wismar, Hansestadt "Gewerbegebiet Haffeld Süd I, Am Torney"
In force since 25 June 2006 1.0 km away
-
BPlan Nr. 39/96, 00, Wismar, Hansestadt "Gewerbegebiet Haffeld Süd I, Am Torney"
In force since 7 April 2001 1.1 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.