Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 42/96, 2. Änderung, Wismar, Hansestadt "Gelände Zuckerfabrik"
The development plan covers an area in Hansestadt Wismar, Landkreis Nordwestmecklenburg. It has been in force since 28 May 2006. The plan area covers about 4.3 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Hansestadt Wismar
- District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 28 May 2006
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 42/96, 2. Änderung, - Area
- about 4.3 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version (this page)
BPlan Nr. 42/96, 2. Änderung, Wismar, Hansestadt "Gelände Zuckerfabrik"
In force since 28 May 2006 about 4.3 ha
-
Amendment no. 1
BPlan Nr. 42/96, 1. Änderung Wismar, Hansestadt "Gelände Zuckerfabrik"
In force since 6 April 2002 about 13.3 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 61/04, 1. Änderung, Wismar, Hansestadt "Wohn- und Mischgebiet Rostocker Straße"
In progress: Decision to draw up the plan 150 m away
-
BPlan Nr. 42/96, 00, Wismar, Hansestadt "Gelände Zuckerfabrik"
In force since 22 March 1998 250 m away
-
BPlan Nr. 61/04, 00, Wismar, Hansestadt "Wohn- und Mischgebiet Rostocker Straße/Philosophenweg"
In force since 10 June 2007 250 m away
-
BPlan Nr. 77/100, Wismar, Hansestadt "Sondergebiet Photovoltaikanlage Wismar Ost"
In force since 25 December 2011 350 m away
-
Vorhabensbezogener BPlan Nr. 10/92 Wismar, Hansestadt "Wohnungsbau Flöter Weg"
In force since 26 May 1996 450 m away
-
BPlan Nr. 64/04, 1. Änderung Wismar, Hansestadt "Molkereiviertel"
In force since 8 December 2018 600 m away
-
BPlan Nr. 64/04, 00, Wismar, Hansestadt "Gewerbegebiet Molkerei-Viertel"
In force since 26 November 2006 600 m away
-
BPlan Nr. 75/09 Wismar, Hansestadt "Stadtteilzentrum Kagenmarkt"
In force since 20 April 2014 600 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.