Simple development plan (einfacher Bebauungsplan) · In force
BPlan Nr. 78 Waren (Müritz), Stadt Warenshof, Am Gutshaus
The development plan covers an area in Stadt Waren (Müritz) (Warenshof area), Landkreis Mecklenburgische Seenplatte. It has been in force since 2 July 2016. The plan area covers about 3,970 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Waren (Müritz)
Village or district Warenshof - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 2 July 2016
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 78
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 3,970 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Waren (Müritz), Stadt Klarstellungs- und Ergänzungssatzung Warenshof
In force since 30 September 1998 under 100 m away
-
BPlan Nr. 88 Waren (Müritz), Stadt Solarpark Warenshof_PV
In force since 29 March 2026 550 m away
-
BPlan Nr. 11 Waren (Müritz), Stadt Freihaltetrasse Warenshof
In force since 31 October 2000 550 m away
-
BPlan Nr. 26 Waren (Müritz), Stadt Wohngebiet Warenshof
In force since 24 June 1997 650 m away
-
BPlan Nr. 20 Waren (Müritz), Stadt Piratenland Warenshof
In force since 19 March 2006 750 m away
-
BPlan Nr. 25 Waren (Müritz), Stadt Alt Gewerbegebiet Waren-West
In force since 30 July 2016 900 m away
-
In force since 26 May 2012 950 m away
-
BPlan Nr. 21. Änderung Waren (Müritz), Stadt Piratenland Warenshof, Teilgebiet Bürgersolaranlage_PV
In force since 12 February 2011 950 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.