Development plan (Bebauungsplan) · In force
BPlan Nr. 1/2002 Userin Erw.Camping-u.Ferienpark Havelberge a.Woblitzsee
The development plan covers an area in the municipality of Userin (Groß Quassow area), Landkreis Mecklenburgische Seenplatte. It has been in force since 1 July 2006. The plan area covers about 5.6 hectares.
There is a newer version: Amendment no. 1, In force since 30 April 2008
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Userin
Village or district Groß Quassow - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 1 July 2006
- Type of plan
- Development plan (Bebauungsplan)
No. 1/2002 - Area
- about 5.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a holiday or leisure project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version
BPlan Nr. 1/2002, 1.Änderung Userin Erw.Camping-u.Ferienpark Havelberge a.Woblitzsee
In force since 30 April 2008 about 5.6 ha
-
Original version (this page)
BPlan Nr. 1/2002 Userin Erw.Camping-u.Ferienpark Havelberge a.Woblitzsee
In force since 1 July 2006 about 5.6 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 3, 3.Änderung Userin Camping- und Freizeitpark Havelberge am Woblitzsee
Adopted as a bylaw 450 m away
-
BPlan Nr. 3/1996 Userin Camping- und Ferienpark Havelberge am Woblitzsee
In force since 6 June 1998 450 m away
-
BPlan Nr. 04/91 Wesenberg, Stadt Siedlung Wesenberg, 5. Änderung
In force since 11 February 2012 2.1 km away Stadt Wesenberg 6 versions
-
BPlan Nr. 01/2001. Änderung Userin Ortseingang Voßwinkel sowie Weg Richtung Flößerkanal
In force since 5 March 2017 2.3 km away
-
BPlan Nr. 01/2000 Userin Ortseingang Vosswinkel sowie Weg Richtung Flößerkanal
In force since 23 March 2003 2.3 km away
-
BPlan Nr. keine Userin Useriner Mühle Ost
In progress: Draft 2.3 km away
-
Vorhabensbezogener BPlan Nr. 01/25 Wesenberg, Stadt Ferienpark, Am Zühlensee
In force since 22 February 2026 2.4 km away Stadt Wesenberg
-
BPlan Nr. 3/94 Wesenberg, Stadt Holzindustrie, Am Zühlensee, 2.Änderung
In force since 11 December 2016 2.4 km away Stadt Wesenberg 3 versions
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.