Development plan (Bebauungsplan) · In force
BPlan Nr. 17.1 Teterow, Bergringstadt "Industriegebiet Bocksbergweg"
The development plan covers an area in Bergringstadt Teterow, Landkreis Rostock. It has been in force since 18 November 2001. The plan area covers about 12.5 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Bergringstadt Teterow
- District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 18 November 2001
- Type of plan
- Development plan (Bebauungsplan)
No. 17.1 - Area
- about 12.5 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 17.2 -Teilbereich II- 2. Änderung Teterow, Bergringstadt "Bocksbergweg"
In force since 21 September 2003 150 m away 3 versions
-
No longer in force 150 m away 2 versions
-
BPlan Nr. 17A Teterow, Bergringstadt "Bocksbergweg"
In force since 28 May 2019 250 m away 3 versions
-
BPlan Nr. 17 Teterow, Bergringstadt "Bocksbergweg"
In force since 6 July 1993 400 m away
-
BPlan Nr. 17.2 Teterow, Bergringstadt "Bocksbergweg/Robert-Koch-Str."
In force since 1 May 2024 450 m away
-
BPlan Nr. 17.3, 1. Änderung Teterow, Bergringstadt "Bocksbergweg"
In force since 26 June 2005 500 m away
-
BPlan Nr. 44 Teterow, Bergringstadt Camping-Bergring
In force since 16 October 2005 900 m away
-
BPlan Nr. 2/I Teterow, Bergringstadt "Auf dem Vietsmorgen"
In force since 27 March 2005 1.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.