Development plan (Bebauungsplan) · In force
BPlan Nr. 34, 1. Änderung Teterow, Bergringstadt Am Stubbenbruch
The development plan covers an area in Bergringstadt Teterow, Landkreis Rostock. It has been in force since 14 February 2017. The plan area covers about 3.1 hectares.
There is a newer version: Amendment no. 3, In force since 13 December 2022
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Bergringstadt Teterow
- District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 14 February 2017
- Type of plan
- Development plan (Bebauungsplan)
No. 34, 1. Änderung
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 3.1 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 3, latest version
BPlan Nr. 34, 3. Änderung Teterow, Bergringstadt Am Stubbenbruch
In force since 13 December 2022 about 2.1 ha
-
Amendment no. 2
BPlan Nr. 34, 2. Änderung Teterow, Bergringstadt Am Stubbenbruch
In force since 29 May 2018 about 6,270 m²
-
Amendment no. 1 (this page)
BPlan Nr. 34, 1. Änderung Teterow, Bergringstadt Am Stubbenbruch
In force since 14 February 2017 about 3.1 ha
-
Original version
BPlan Nr. 34 Teterow, Bergringstadt Am Stubbenbruch
In force since 17 August 2003 about 5.5 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 36, 1. Teterow, Bergringstadt Am Reitplatz
In force since 17 August 2003 200 m away
-
Vorhabensbezogener BPlan Nr. 45 Teterow, Bergringstadt Plan
In force since 16 October 2005 250 m away
-
BPlan Nr. 61 Teterow, Bergringstadt Wohngebiet Zum Wasserwerk
In force since 10 November 2015 300 m away
-
BPlan Nr. 61, 1. Teterow, Bergringstadt Wohngebiet Zum Wasserwerk
In force since 20 March 2018 350 m away
-
Vorhabensbezogener BPlan Nr. 59 Teterow, Bergringstadt SO Fischzucht und Angeltourismus
In force since 19 December 2014 500 m away
-
BPlan Nr. 70 Teterow, Bergringstadt Glasower Weg
In progress: Decision to draw up the plan 500 m away
-
BPlan Nr. 65 Teterow, Bergringstadt Mühlenblick
In force since 30 August 2022 550 m away
-
BPlan Nr. 39 Teterow, Bergringstadt Von-Moltke-Straße/Niels-Stensen-Straße
In force since 15 February 2004 600 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.