Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 14 Steinhagen OT Negast Einzelhandel
The development plan covers an area in the municipality of Steinhagen (Negast area), Landkreis Vorpommern-Rügen. It has been in force since 6 January 2011. The plan area covers about 5,020 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Steinhagen
Village or district Negast - District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 6 January 2011
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 14 - Area
- about 5,020 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a shop or commercial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 14, 1. Änderung Steinhagen "Einzelhandel im Ortsteil Negast"
In progress: Draft under 100 m away
-
BPlan Nr. 4 Steinhagen OT Negast Dorfbegegnungsstätte
In force since 25 July 2003 under 100 m away
-
BPlan Nr. 18.1 Steinhagen OT Negast Ortskern Negast
In force since 13 April 2017 under 100 m away
-
In force since 10 March 1994 150 m away
-
BPlan Nr. 19 Steinhagen OT Negast Haselbogen
In force since 26 June 2016 200 m away
-
BPlan Nr. 8 Steinhagen OT Negast Mitte 1. Änderung
In force since 2 October 2009 350 m away 2 versions
-
BPlan Nr. 7 Steinhagen OT Negast Sportplatz
In force since 18 July 2006 350 m away
-
Vorhabensbezogener BPlan Nr. 5 Steinhagen OT Negast Wohnpark Am Borgwallsee
In force since 4 August 1993 550 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.