Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 44.03 Schwerin, Landeshauptstadt Warnitz, Silberberg
The development plan covers an area in Landeshauptstadt Schwerin (Warnitz area). It has been in force since 14 June 2006. The plan area covers about 7.2 hectares.
There is a newer version: Amendment no. 2, In force since 30 May 2014
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Landeshauptstadt Schwerin
Village or district Warnitz - Independent city
- Schwerin
Surveying in this region - Legal status
- In force since 14 June 2006
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 44.03 - Area
- about 7.2 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version
BPlan Nr. 44.03, 2. Änderung Schwerin, Landeshauptstadt Warnitz, Silberberg
In force since 30 May 2014 about 1.2 ha
-
Amendment no. 1
BPlan Nr. 44.03, 1. Änderung Schwerin, Landeshauptstadt Warnitz, Silberberg
In force since 23 January 2009 about 1.2 ha
-
Original version (this page)
BPlan Nr. 44.03 Schwerin, Landeshauptstadt Warnitz, Silberberg
In force since 14 June 2006 about 7.2 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 126 Schwerin, Landeshauptstadt Tiny Häuser Warnitz, Bahnhofstraße
In progress: Early public consultation 150 m away
-
Innenbereichssatzung Nr. § 34 Abs. 4 Nr. 3 Schwerin, Landeshauptstadt Warnitz-Forstweg
In force since 2 March 2018 200 m away
-
BPlan Nr. 43.03 Schwerin, Landeshauptstadt Warnitz, Wiesengrund
In force since 13 April 2006 300 m away
-
BPlan Nr. 42.02/1 Schwerin, Landeshauptstadt Warnitz, Bahnhoftsraße
In force since 16 September 2005 350 m away
-
BPlan Nr. 42.02 Schwerin, Landeshauptstadt Warnitz, Kirschenhöfer Weg/Bahnhofstraße
In force since 14 November 2003 450 m away
-
Vorhabensbezogener BPlan Nr. II/91 Schwerin, Landeshauptstadt Warnitz Kirschenhöfer Weg
Adopted as a bylaw 500 m away
-
BPlan Nr. 60.08 Schwerin, Landeshauptstadt Warnitz, Am Steinberg
In force since 3 April 2009 550 m away
-
BPlan Nr. 14.91.01 Schwerin, Landeshauptstadt Schwerin, Friedrichsthal
In force since 24 September 1995 650 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.