Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 80.12 Schwerin, Landeshauptstadt Stern Buchholz, Blücher Umweltpark
The development plan covers an area in Landeshauptstadt Schwerin (Göhrener Tannen area). It has been in force since 14 June 2013. The plan area covers about 22.7 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Landeshauptstadt Schwerin
Village or district Göhrener Tannen - Independent city
- Schwerin
Surveying in this region - Legal status
- In force since 14 June 2013
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 80.12 - Area
- about 22.7 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 58.14 Schwerin, Landeshauptstadt Solarpark Stern Buchholz
In force since 28 August 2015 1.7 km away
-
Innenbereichssatzung Plate OT Consrade
In force since 1 June 2010 1.7 km away Plate
-
In force since 22 December 2018 1.8 km away Plate
-
BPlan Nr. 24 Plate OT Consrade Consrader Straße II
In force since 31 May 2024 1.9 km away Plate
-
BPlan Nr. 5 Plate OT Consrade Consrader Str.
In force since 19 November 1998 2.0 km away Plate
-
BPlan Nr. 39 Schwerin, Landeshauptstadt Industriepark Göhrener Tannen
In force since 31 January 2003 2.2 km away
-
In force since 6 March 1994 3.4 km away
-
BPlan Nr. 25.95.01 Schwerin, Landeshauptstadt Ludwigsluster Chaussee/Am Grünen Tal 2. Änderung
In progress: Draft 3.5 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.