Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 21 Schönberg, Stadt OT Sabow Industrie- und Gewerbepark an der A 20
The development plan covers an area in Stadt Schönberg (Sabow area), Landkreis Nordwestmecklenburg. It has been in force since 1 July 2006. The plan area covers about 51.0 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Stadt Schönberg
Village or district Sabow - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 1 July 2006
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 21 - Area
- about 51.0 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
In progress: Decision to draw up the plan under 100 m away
-
Innenbereichssatzung Schönberg, Stadt OT Sabow
In force since 30 September 2008 550 m away
-
Vorhabensbezogener BPlan Nr. 17 Schönberg, Stadt OT Sabow Standortsicherung Anlagen Firma Güte-Beton
In force since 28 January 2006 750 m away
-
Vorhabensbezogener BPlan Nr. 1 Siemz-Niendorf OT Groß Siemz Solarpark an der A 20
In force since 27 June 2020 950 m away Siemz-Niendorf
-
BPlan Nr. 2 Roduchelstorf OT Rabensdorf Dorf Am Retelsdorfer Weg
In force since 22 May 1996 1.2 km away Roduchelstorf
-
In progress: Decision to draw up the plan 1.2 km away Siemz-Niendorf
-
BPlan Nr. 21 Schönberg, Stadt OT Sabow Industrie- und Gewerbepark an der A20, Aufhebung
In progress: Draft 1.3 km away
-
In progress: Decision to draw up the plan 1.5 km away Roduchelstorf
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.