Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 2 Sassnitz, Stadt Stadtzentrum
The development plan covers an area in Stadt Sassnitz, Landkreis Vorpommern-Rügen. It has been in force since 1 December 1992. The plan area covers about 11.2 hectares.
There is a newer version: Amendment no. 7, Adopted as a bylaw
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Sassnitz
- District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 1 December 1992
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 2 - Area
- about 11.2 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 7, latest version
BPlan Nr. 2, 7. Änderung Sassnitz, Stadt Stadtzentrum
Adopted as a bylaw about 2,890 m²
-
Amendment no. 6
BPlan Nr. 2, 6. Änderung Sassnitz, Stadt Stadtzentrum
In force since 27 February 2023 about 3,830 m²
-
Amendment no. 4
BPlan Nr. 2, 4. Änderung Sassnitz, Stadt Stadtzentrum
In force since 25 October 2017 about 2,830 m²
-
Amendment no. 3
BPlan Nr. 2, 3. Änderung Sassnitz, Stadt Stadtzentrum
In force since 17 July 2006 about 1.7 ha
-
Amendment no. 2
BPlan Nr. 2, 2. Änderung Sassnitz, Stadt Stadtzentrum
In force since 23 August 1995 about 11.2 ha
-
Amendment no. 1
BPlan Nr. 2, 1. Änderung Sassnitz, Stadt Stadtzentrum
In force since 1 December 1992 about 11.2 ha
-
Original version (this page)
BPlan Nr. 2 Sassnitz, Stadt Stadtzentrum
In force since 1 December 1992 about 11.2 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Vorhabensbezogener BPlan Nr. 58 Sassnitz, Stadt Wohn- und Hotelanlage Waldmeisterstraße
In progress: Decision to draw up the plan 200 m away
-
BPlan Nr. 10.1, 4. Änderung Sassnitz, Stadt Stadthafen, Östlicher Teil
In progress: Draft 250 m away 4 versions
-
BPlan Nr. 10.1 Sassnitz, Stadt Sondergebiet Stadthafen, Östlicher Teil
In force since 2 August 2011 250 m away
-
BPlan Nr. 14, 8. Änderung Sassnitz, Stadt Stadtmitte
In force since 25 August 2025 300 m away 7 versions
-
BPlan Nr. 39, 1. Änderung Sassnitz, Stadt Fährterrassen Trelleborger Straße
In progress: Draft 300 m away
-
BPlan Nr. 53 Sassnitz, Stadt Wohnanlage Victoriastraße
In progress: Decision to draw up the plan 350 m away
-
BPlan Nr. 39 Sassnitz, Stadt Fährterrassen Trellborger Straße
In force since 31 March 2015 450 m away
-
BPlan Nr. 28 Sassnitz, Stadt Wohnanlage Villa Clara, Hafenstraße
In force since 27 June 2017 550 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.