Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 21 Sassnitz, Stadt Industriegebiet Mukran, Südstrasse
The development plan covers an area in Stadt Sassnitz (Mukran area), Landkreis Vorpommern-Rügen. It has been in force since 21 July 2009. The plan area covers about 35.2 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Sassnitz
Village or district Mukran - District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 21 July 2009
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 21 - Area
- about 35.2 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 29, 1. Änderung Sassnitz, Stadt Fährhafen Sassnitz, Sondergebiet Süd
In force since 29 October 2013 650 m away 2 versions
-
BPlan Nr. 41 Sassnitz, Stadt Wohnanlage Staphel
In force since 4 September 2018 700 m away
-
BPlan Nr. 22, 2. Änderung Sassnitz, Stadt Seepark Sassnitz/Staphel
In force since 27 June 2017 750 m away 2 versions
-
Vorhabensbezogener BPlan Nr. 4 Sassnitz, Stadt Aparthotel Königslinie
In force since 13 January 2015 1.0 km away
-
BPlan Nr. 7.1, 1. Änderung Sassnitz, Stadt Gewerbe- und Industriegebiet Hafen Mukran
In progress: Decision to draw up the plan 1.0 km away 2 versions
-
BPlan Nr. 42 Sassnitz, Stadt Fährhafen Sassnitz, Erweiterungsgebiet Offshore Süd
In force since 18 December 2018 1.0 km away
-
Vorhabensbezogener BPlan Nr. 12 Binz, Ostseebad OT Prora Parkplatz Feuersteinfelder
In force since 5 April 2011 1.3 km away Ostseebad Binz
-
Vorhabensbezogener BPlan Nr. 09 Binz, Ostseebad OT Prora Rüganer
In force since 14 December 2010 1.4 km away Ostseebad Binz
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.