Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 95 Ribnitz-Damgarten, Bernsteinstadt „SO Großflächiger Einzelhandel und Wohnen“, Damgartener Chaussee, I. Änderung und I. Ergänzung
The development plan covers an area in Bernsteinstadt Ribnitz-Damgarten (Ribnitz area), Landkreis Vorpommern-Rügen. It has been in force since 15 December 2025. The plan area covers about 1.1 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Bernsteinstadt Ribnitz-Damgarten
Village or district Ribnitz - District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 15 December 2025
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 95
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 1.1 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a shop or commercial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
In force since 8 March 2023 under 100 m away
-
In force since 4 November 2008 200 m away
-
BPlan Nr. 8 Ribnitz-Damgarten, Bernsteinstadt OT Ribnitz Damgartener Chaussee 2. Änderung
In force since 28 December 2011 200 m away 2 versions
-
BPlan Nr. 6 Ribnitz-Damgarten, Bernsteinstadt OT Ribnitz Gewerbegebiet Süd 1. Änderung
In force since 9 July 2001 500 m away 2 versions
-
BPlan Nr. 36 Ribnitz-Damgarten, Bernsteinstadt OT Ribnitz Wohnbebauung Worth Länder
In force since 20 December 1999 500 m away
-
In progress: Decision to draw up the plan 700 m away
-
In force since 9 November 1998 850 m away
-
BPlan Nr. 16 Ribnitz-Damgarten, Bernsteinstadt OT Ribnitz Mittelweg
In force since 14 May 1998 950 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.