Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 5 Rehna, Stadt OT Rehna Milchsteig
The development plan covers an area in Stadt Rehna, Landkreis Nordwestmecklenburg. It has been in force since 10 August 1999. The plan area covers about 6.6 hectares.
There is a newer version: Amendment no. 4, In force since 30 June 2021
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Rehna
- District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 10 August 1999
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 5 - Area
- about 6.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 4, latest version
BPlan Nr. 5 Rehna, Stadt OT Rehna Milchsteig 4. Änderung
In force since 30 June 2021 about 6.6 ha
-
Amendment no. 3
BPlan Nr. 5 Rehna, Stadt OT Rehna Milchsteig 3. Änderung
In force since 21 December 2013 about 6.6 ha
-
Amendment no. 2
BPlan Nr. 5 Rehna, Stadt OT Rehna Milchsteig 2. Änderung
In force since 26 February 2006 about 6.6 ha
-
Original version (this page)
BPlan Nr. 5 Rehna, Stadt OT Rehna Milchsteig
In force since 10 August 1999 about 6.6 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 15 Rehna, Stadt OT Rehna Am Wasserwerk
In force since 23 February 2014 250 m away
-
BPlan Nr. 9 Rehna, Stadt OT Rehna Am Mühlenteich 1. Änderung
In force since 26 October 2007 450 m away 2 versions
-
BPlan Nr. 7 Rehna, Stadt OT Rehna Östlich des Klosters
In force since 19 July 2006 500 m away
-
BPlan Nr. 4 Rehna, Stadt OT Rehna Neuer Steinweg
In force since 27 April 1995 550 m away
-
Innenbereichssatzung Rehna, Stadt OT Rehna Neufassung
In force since 21 September 2014 550 m away
-
BPlan Nr. 2 Rehna, Stadt OT Rehna Alter Sportplatz
In force since 21 March 1995 600 m away
-
BPlan Nr. 8 Rehna, Stadt OT Rehna Westlich Neuer Steinweg 1. Änderung
In force since 14 January 2010 650 m away 2 versions
-
BPlan Nr. 14 Rehna, Stadt OT Rehna ehemals Tricota 1. Änderung
In force since 29 March 2015 650 m away 2 versions
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.