Simple development plan (einfacher Bebauungsplan) · In force
BPlan Nr. 15 Prerow, Ostseebad "Strandaufgang, Hauptübergang", 1. Änderung
The development plan covers an area in Ostseebad Prerow, Landkreis Vorpommern-Rügen. It has been in force since 1 August 2025. The plan area covers about 12.9 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 12 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 12 October 2026
- Location
- Ostseebad Prerow
- District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 1 August 2025
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 15
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 12.9 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the simplified procedure under § 13 BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version (this page)
BPlan Nr. 15 Prerow, Ostseebad "Strandaufgang, Hauptübergang", 1. Änderung
In force since 1 August 2025 about 12.9 ha
-
Original version
BPlan Nr. 15 Prerow, Ostseebad "Strandaufgang, Hauptübergang"
In force since 19 July 2006 about 14.0 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 17 Prerow, Ostseebad "Ortszentrum", 2. Änderung
In force since 15 November 2011 450 m away 3 versions
-
BPlan Nr. 7 Prerow, Ostseebad "Wohnungsbau östlich der Bergstraße"
In force since 4 January 2002 800 m away
-
Vorhaben- und Erschliessungsplan Nr. 4 Prerow, Ostseebad "Buchen/Hagen"
In force since 11 October 1994 800 m away
-
BPlan Nr. 47 Prerow, Ostseebad "Bebelstraße / Schulstraße / Lentzallee"
In force since 23 February 2016 800 m away
-
BPlan Nr. 45 Prerow, Ostseebad "Bernsteinweg/ Villenstraße"
In force since 20 May 2011 850 m away
-
BPlan Nr. 45 Prerow, Ostseebad "Bernsteinweg/Villenstraße", 1.Änderung
In force since 10 March 2018 900 m away
-
BPlan Nr. 8 Prerow, Ostseebad "Kulturelles Zentrum mit Festwiese", 3. Änderung
In force since 1 August 2025 950 m away 4 versions
-
BPlan Nr. 11 Prerow, Ostseebad "Einkaufszentrum Strandstraße"
In force since 15 June 2006 1.0 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 12 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.