BPlan Nr. 16/91-15(1)/92, 5. Änderung Neustrelitz, Residenzstadt Wesenberger Chaussee-Süd/ Schlangenallee
The development plan covers an area in Residenzstadt Neustrelitz, Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Draft). The plan area covers about 4.8 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Residenzstadt Neustrelitz
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In progress: Draft
Decision to draw up the plan on 27 March 2021 - Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 16/91-15(1)/92, 5. Änderung
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 4.8 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 5, latest version (this page)
BPlan Nr. 16/91-15(1)/92, 5. Änderung Neustrelitz, Residenzstadt Wesenberger Chaussee-Süd/ Schlangenallee
In progress: Draft about 4.8 ha
-
Amendment no. 4
In force since 6 February 2022 about 2.2 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 16/91-15(1)/92 Neustrelitz, Residenzstadt B 198 Süd/ Schlangenallee 3. Änderung
In force since 18 October 2003 250 m away 4 versions
-
BPlan Nr. 10/91 Neustrelitz, Residenzstadt B 198 Nord
In force since 10 December 1997 500 m away
-
BPlan Nr. 15(2)/91 Neustrelitz, Residenzstadt Schlangenallee, Ost
In force since 8 March 2003 750 m away
-
Vorhabensbezogener BPlan Nr. 5/95 Neustrelitz, Residenzstadt Betonwerk Neustrelitz
In force since 3 April 1996 1.3 km away
-
BPlan Nr. 09/91 Neustrelitz, Residenzstadt Großer Spiegelberg
In force since 21 August 1997 1.3 km away
-
BPlan Nr. 43/96 Neustrelitz, Residenzstadt Jugendanstalt 1. Änderung
In force since 11 November 2017 1.4 km away
-
In force since 14 September 2019 1.4 km away
-
BPlan Nr. 49/03 Neustrelitz, Residenzstadt Scheunenviertel Wesenberger Straße
In force since 9 July 2005 1.5 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.